⌘K
EN
FR
Able Electric 2016 Limited — contrats gouvernementaux · CanPursue
Fournisseurs
Able Electric 2016 Limited
Aussi connu sous: Able Electric 2016 Limited
Observé
Suivre
Valeur observée
11,7 M $
Contrats
12
Attributions
1
Acheteurs
7
Aperçu
Contrats
Attributions
Acheteurs
Catégories
Activité
Electrical system services
Attribué, 10 févr. 2026
Marine installations
Attribué, 16 janv. 2026
Communications/Networking equipment (includes analog, digital and combined analog/digital equipment, cabling, parts and peripherals)
Attribué, 28 nov. 2025
Other engineering works
Attribué, 3 déc. 2024
Other professional services not elsewhere specified
Attribué, 20 mars 2024
Parks Canada is building a new green micro-grid power generation system at Sable Island National Park Reserve that will combine solar panels, two variable speed generators, and a battery storage system to reduce greenhouse gas emissions by 50 percent. The project also includes energy-efficient building upgrades, such as heat pumps and lighting controls, to lower electricity demand. The first stage of the procurement has closed, and the second stage will be tendered to a pre-qualified list.
Attribué, 12 mars 2024
Phase 1 - Micro-réseau durable de la réserve de parc national de l’Île-de-Sable
Attribué, 21 févr. 2024
Generator Replacements (2 Locations)
Attribué, 12 févr. 2024
Metro Generator Replacement
Attribué, 16 janv. 2024
Other professional services not elsewhere specified
Attribué, 7 nov. 2023
CONNOR LANE FIRE ALARM SYSTEM UPGRADE
Attribué, 24 mai 2023
NSCC Ivany Campus Student Housing - Electrical
Attribué, 11 janv. 2023
Seeking professional electrical construction services to supply, construct and install necessary infrastructure for a new high-voltage duct bank located near the east end of Salter Street.
Attribué, 6 mars 2017