CanPursue

Recherche

  • Recherche
  • Occasions
  • Acheteurs
  • Fournisseurs
  • Contrats
  • Attributions

Intelligence

  • AperçuCompte requis
  • Listes de suiviCompte requis
  • PipelineCompte requis
  • IntelligenceCompte requis
Créer un compte gratuit

Connexion

⌘K
ENFR
Parks Canada is building a new green micro-grid power generation system at Sable Island National Park Reserve that will combine solar panels, two variable speed generators, and a battery storage system to reduce greenhouse gas emissions by 50 percent. The project also includes energy-efficient building upgrades, such as heat pumps and lighting controls, to lower electricity demand. The first stage of the procurement has closed, and the second stage will be tendered to a pre-qualified list. | Contrat gouvernemental · CanPursue
Contrats
competitive

Parks Canada is building a new green micro-grid power generation system at Sable Island National Park Reserve that will combine solar panels, two variable speed generators, and a battery storage system to reduce greenhouse gas emissions by 50 percent. The project also includes energy-efficient building upgrades, such as heat pumps and lighting controls, to lower electricity demand. The first stage of the procurement has closed, and the second stage will be tendered to a pre-qualified list.

Parks CanadaAble Electric 2016 Limited45467616
Ouvrir la source officielleSuivre
Valeur totale du contrat
4,8 M $
Valeur initiale attribuée
4,2 M $
Début
12 mars 2024
Fin
—

Chronologie

Officiel
  • Attribué12 mars 2024. Valeur initiale attribuée: 4,2 M $
Numéro de contrat
45467616
Attribué
12 mars 2024
Instrument
—
Statut
competitive
Modifications
0 modifications
Source
Federal contracts over $10,000 (Ouvrir la source officielle)
pc
Approvisionnement lié
Aucun approvisionnement lié observé.