⌘K
EN
FR
Able Electric 2016 Limited — contrats gouvernementaux · CanPursue
Fournisseurs
Able Electric 2016 Limited
Aussi connu sous: Able Electric 2016 Limited
Observé
Suivre
Valeur observée
11,7 M $
Contrats
12
Attributions
1
Acheteurs
7
Aperçu
Contrats
Attributions
Acheteurs
Catégories
Activité
Contrats récents
Electrical system services
Fisheries and Oceans Canada
16 856,04 $
Marine installations
Fisheries and Oceans Canada
253,4 k $
Communications/Networking equipment (includes analog, digital and combined analog/digital equipment, cabling, parts and peripherals)
Department of National Defence
163,7 k $
Other engineering works
Public Services and Procurement Canada
14 456,79 $
Other professional services not elsewhere specified
Public Services and Procurement Canada
45 364,42 $
Parks Canada is building a new green micro-grid power generation system at Sable Island National Park Reserve that will combine solar panels, two variable speed generators, and a battery storage system to reduce greenhouse gas emissions by 50 percent. The project also includes energy-efficient building upgrades, such as heat pumps and lighting controls, to lower electricity demand. The first stage of the procurement has closed, and the second stage will be tendered to a pre-qualified list.
Parks Canada
4,8 M $
Generator Replacements (2 Locations)
Nova Scotia Provincial Housing Agency
84 900 $
Metro Generator Replacement
Nova Scotia Provincial Housing Agency
1,1 M $