Robert B Somerville — contrats gouvernementaux · CanPursue
Fournisseurs

Robert B Somerville

Observé
Suivre
Valeur observée
11,4 M $
Contrats
9
Attributions
0
Acheteurs
1
AperçuContratsAttributionsAcheteursCatégoriesActivité
DossierAcheteurValeurAttribué
Notice1822019Notice1822019City of Toronto201,8 k $7 août 2019
51201900005120190000City of Toronto744,5 k $30 mai 2019
31201900003120190000City of Toronto752,6 k $29 mai 2019
23820180002382018000City of Toronto8,7 M $6 déc. 2018
20220160002022016000City of Toronto261,2 k $2 août 2016
19420160001942016000City of Toronto219,4 k $27 juill. 2016
21520160002152016000City of Toronto174,4 k $26 juill. 2016
12620160001262016000City of Toronto299,5 k $23 juin 2016
This contract includes, in general, the following work: • Provision of various shop drawings covering all aspects of the work, liner designs, installation procedures, safety plans and project schedules. • Procurement of specialized inspection contractors, materials, and fittings to facilitate the work to be completed. • Permitting, notifications to the public, and responses to concerns during construction. • Pre-surveying of properties and associated water meters and services. • Coordination of locates for watermain and underground utilities. • Implementation of traffic control on site. • Design and implementation of temporary bypass systems to facilitate the work. • Camera inspection (CCTV) of the interior of the watermain for pre-cleaning, post-cleaning, pre-lining, post-lining, and warranty purposes. • Test excavation pits for confirmatory purposes. • Excavation of access pits. • Where required, installation of new copper water services from the existing water main to the street line. • Dis-infection of watermain, fittings, CCTV equipment, and tools throughout the work. • Host pipe preparation, including repairs, cleaning, and field measurements. • Rehabilitation of existing watermains by installation of CIPP liners. • Sampling of CIPP liners on site and provision of third party testing. • Collection of resin samples. • Reinstatement of services. • Wet-taps of existing watermains to facilitate new services. • Replacement of existing valves, hydrants, and fittings. • Replacement or rehabilitation of hydrant leads and existing service connections which are 100 mm and larger in diameter. • Recommissioning the rehabilitated watermain and pressure testing. • Complete Restoration.5379596509City of Toronto——