This contract includes, in general, the following work: • Provision of various shop drawings covering all aspects of the work, liner designs, installation procedures, safety plans and project schedules. • Procurement of specialized inspection contractors, materials, and fittings to facilitate the work to be completed. • Permitting, notifications to the public, and responses to concerns during construction. • Pre-surveying of properties and associated water meters and services. • Coordination of locates for watermain and underground utilities. • Implementation of traffic control on site. • Design and implementation of temporary bypass systems to facilitate the work. • Camera inspection (CCTV) of the interior of the watermain for pre-cleaning, post-cleaning, pre-lining, post-lining, and warranty purposes. • Test excavation pits for confirmatory purposes. • Excavation of access pits. • Where required, installation of new copper water services from the existing water main to the street line. • Dis-infection of watermain, fittings, CCTV equipment, and tools throughout the work. • Host pipe preparation, including repairs, cleaning, and field measurements. • Rehabilitation of existing watermains by installation of CIPP liners. • Sampling of CIPP liners on site and provision of third party testing. • Collection of resin samples. • Reinstatement of services. • Wet-taps of existing watermains to facilitate new services. • Replacement of existing valves, hydrants, and fittings. • Replacement or rehabilitation of hydrant leads and existing service connections which are 100 mm and larger in diameter. • Recommissioning the rehabilitated watermain and pressure testing. • Complete Restoration. | Contrat gouvernemental · CanPursue
This contract includes, in general, the following work: • Provision of various shop drawings covering all aspects of the work, liner designs, installation procedures, safety plans and project schedules. • Procurement of specialized inspection contractors, materials, and fittings to facilitate the work to be completed. • Permitting, notifications to the public, and responses to concerns during construction. • Pre-surveying of properties and associated water meters and services. • Coordination of locates for watermain and underground utilities. • Implementation of traffic control on site. • Design and implementation of temporary bypass systems to facilitate the work. • Camera inspection (CCTV) of the interior of the watermain for pre-cleaning, post-cleaning, pre-lining, post-lining, and warranty purposes. • Test excavation pits for confirmatory purposes. • Excavation of access pits. • Where required, installation of new copper water services from the existing water main to the street line. • Dis-infection of watermain, fittings, CCTV equipment, and tools throughout the work. • Host pipe preparation, including repairs, cleaning, and field measurements. • Rehabilitation of existing watermains by installation of CIPP liners. • Sampling of CIPP liners on site and provision of third party testing. • Collection of resin samples. • Reinstatement of services. • Wet-taps of existing watermains to facilitate new services. • Replacement of existing valves, hydrants, and fittings. • Replacement or rehabilitation of hydrant leads and existing service connections which are 100 mm and larger in diameter. • Recommissioning the rehabilitated watermain and pressure testing. • Complete Restoration.