⌘K
EN
FR
MELFER CONSTRUCTION INC. — contrats gouvernementaux · CanPursue
Fournisseurs
MELFER CONSTRUCTION INC.
Observé
Suivre
Valeur observée
0 $
Contrats
2
Attributions
0
Acheteurs
1
Aperçu
Contrats
Attributions
Acheteurs
Catégories
Activité
For Grant Faulkner Park Construction (New Park at 320 Markham Rd.) The property is currently vacant with no park programming. The Work comprises full project management and coordination; site preparation including hoarding, sediment control, clearing, removals, and protection of existing features; earthworks and grading; installation of drainage and infiltration systems; water service installation to a bottle filling station; supply and placement of topsoil, sod, seeding, and tree planting; construction of asphalt pathways, parking areas and driveways; concrete slabs, curbs, ramps and footings; permeable pavers, retaining features and playground safety surfacing; installation of fencing, gates, cricket practice cage, shade shelter, site furnishings, bike racks, sports equipment and line painting; and all associated electrical works under cash allowance, including playground equipment, accessible swing, inspection and testing, all in accordance with the Contract Documents.
Attribué, 11 août 2026