For Grant Faulkner Park Construction (New Park at 320 Markham Rd.) The property is currently vacant with no park programming. The Work comprises full project management and coordination; site preparation including hoarding, sediment control, clearing, removals, and protection of existing features; earthworks and grading; installation of drainage and infiltration systems; water service installation to a bottle filling station; supply and placement of topsoil, sod, seeding, and tree planting; construction of asphalt pathways, parking areas and driveways; concrete slabs, curbs, ramps and footings; permeable pavers, retaining features and playground safety surfacing; installation of fencing, gates, cricket practice cage, shade shelter, site furnishings, bike racks, sports equipment and line painting; and all associated electrical works under cash allowance, including playground equipment, accessible swing, inspection and testing, all in accordance with the Contract Documents. | Contrat gouvernemental · CanPursue
For Grant Faulkner Park Construction (New Park at 320 Markham Rd.) The property is currently vacant with no park programming. The Work comprises full project management and coordination; site preparation including hoarding, sediment control, clearing, removals, and protection of existing features; earthworks and grading; installation of drainage and infiltration systems; water service installation to a bottle filling station; supply and placement of topsoil, sod, seeding, and tree planting; construction of asphalt pathways, parking areas and driveways; concrete slabs, curbs, ramps and footings; permeable pavers, retaining features and playground safety surfacing; installation of fencing, gates, cricket practice cage, shade shelter, site furnishings, bike racks, sports equipment and line painting; and all associated electrical works under cash allowance, including playground equipment, accessible swing, inspection and testing, all in accordance with the Contract Documents.