CanPursue

Recherche

  • Recherche
  • Occasions
  • Acheteurs
  • Fournisseurs
  • Contrats
  • Attributions

Intelligence

  • AperçuCompte requis
  • Listes de suiviCompte requis
  • PipelineCompte requis
  • IntelligenceCompte requis
Créer un compte gratuit

Connexion

⌘K
ENFR
MARTINWAY CONTRACTING LTD — contrats gouvernementaux · CanPursue
Fournisseurs

MARTINWAY CONTRACTING LTD

Observé
Suivre
Valeur observée
22 M $
Contrats
17
Attributions
0
Acheteurs
2
AperçuContratsAttributionsAcheteursCatégoriesActivité
DossierAcheteurValeurAttribué
The scope of the project includes a partial demolition of the existing building cladding and existing concrete window framing, performing new steel frame installation building cladding & window installation, and miscellaneous items, at the Toronto Island Water Treatment Plant (WTP)5575948524City of Toronto—30 juin 2026
For Dufferin Maintenance Yard Building Repairs. The contract includes in general the following work: To prospective Suppliers to submit bids for the performance of the Work, as further described in Part 3 (DRAWINGS AND SPECIFICATIONS) and the Contract.4746117483City of Toronto1,3 M $13 mars 2025
The automatic gates and electronic sign upgrades described in the contract specifications and drawings. The overall intent is to provide a reliable, robust and safe automatic gates and standardized electronic signs system for the facilities.4700177538City of Toronto7,5 M $10 mars 2025
For Dufferin Maintenance Yard Building Repairs. The contract includes in general the following work: To prospective Suppliers to submit bids for the performance of the Work, as further described in Part 3 (DRAWINGS AND SPECIFICATIONS) and the Contract.4746117483City of Toronto—5 févr. 2025
This Request for Supplier Qualifications ("RFSQ") is an invitation by the City of Toronto ("the City") to prospective Respondents to prequalify for future eligibility to provide professional general contracting services for a total of approximately 350 small capital projects and emergency capital projects per year for the City of Toronto Project Management Office, Corporate Real Estate Management Division Where a Work Assignment having a cost under $70,000 value including construction contingency and cash allowances where applicable HST excluded, the Work Assignment shall be assigned in accordance with the Rotational Process set out in Schedule B1 of Part 4- Form of Agreement. Where a Work Assignment having a cost exceeding $70,000 value including construction contingency and cash allowances where applicable HST excluded, all vendors on the roster list will be required to participate second stage competitive bidding process. The City will issue an RFQ to all Rosters Vendors on the Roster List in accordance with the RFQ Process set out in Schedule B2 of Part 4- Form of Agreement. The City will award future work assignments pursuant to the process described in both schedule B1 and B2 of Work Assignment Process and will be subject to the terms and conditions described in Part 4 - Form of Agreement3743124423City of Toronto3,1 M $23 oct. 2023
29513653012951365301City of Toronto1,5 M $5 nov. 2021
27720180002772018000City of Toronto456,3 k $22 mai 2019
22620180002262018000City of Toronto1,4 M $1 mai 2019
18220180001822018000City of Toronto2,2 M $17 déc. 2018
13020180001302018000City of Toronto555 k $10 oct. 2018
27120170002712017000City of Toronto644,8 k $18 déc. 2017
18620160001862016000City of Toronto2,2 M $25 juill. 2017
Installation Work61061Department of National Defence116 k $15 janv. 2016
24020130002402013000City of Toronto245,6 k $5 déc. 2013
23420130002342013000City of Toronto210,2 k $22 oct. 2013
24020110002402011000City of Toronto560,5 k $10 avr. 2012
The Work, as further described in Part 3 (DRAWINGS AND SPECIFICATIONS) and the Contract (the "Project"). In brief summary, the Work is comprised of but not limited to Operations and Training Modular Building Construction at Keele Valley Closed Landfill. 1. Construction of a single-storey 15.6 metre by 27 metre Modular Office Building on a rammed aggregate pier foundation, electrical, mechanical, and communications for the building, installation of water and sewer services to the building, a paved asphalt parking area and entrance culvert, sidewalks and curbs, and landscaping; and, 2. Structural demolition and removal of three (3) detached buildings and their associated connecting structures, formally used as a training space/lunchroom and all associated infrastructure below ground surface and above ground at the Keele Valley Closed Landfill Site; and, 3. Guaranteed full maintenance of the Modular Office Building for a period of two (2) years after Substantial Performance during the warranty period.5638028942City of Toronto——