Clearwater Structures Inc. — contrats gouvernementaux · CanPursue
Fournisseurs
Clearwater Structures Inc.
Aussi connu sous: Clearwater Structures Inc.
Observé
Suivre
Valeur observée
147,7 M $
Contrats
48
Attributions
5
Acheteurs
6
Aperçu
Contrats
Attributions
Acheteurs
Catégories
Activité
To prospective Suppliers to submit bids for the performance of the Work, as further described in Part 3 (DRAWINGS AND SPECIFICATIONS) and the Contract (the "Project").
Attribué, 23 juin 2026
For sewer and maintenance hole rehabilitation for various locations with the City of Toronto, this work includes, but is not limited to, mainline sanitary, storm and combined gravity sewers rehabilitation using Cured-In-Place Pipe (CIPP) method or other City approved methods (for selective sewer(s)). The Project also includes miscellaneous pre-lining repairs to facilitate the mainline sewer lining works and other repairs within the same geographical area.
Attribué, 14 mai 2026
Full length Trenchless Rehabilitation of Existing Circular Gravity Sewers and Related Works at Various Locations in the City of Toronto (Wards 1, 2, 8, 14, 19), this work includes, but is not limited to, mainline sanitary, storm and combined gravity sewers rehabilitation using Cured-In-Place Pipe (CIPP) method or other City approved methods (for selective sewer(s)).
Attribué, 1 mai 2026
Request for Tender for Full Length Trenchless Rehabilitation of Existing Gravity Sewers and Related Works at Various Locations in the City of Toronto
Attribué, 20 avr. 2026
All labour, equipment and materials for the 2025 transit maintenance work emergency repairs at 11 locations.
Attribué, 1 juill. 2025
The following is a general, but not necessarily complete, description of the work to be constructed under the Contract. The list below is not intended to specify the order of construction/execution. The Works includes, but is not limited to, the following: • Emergency Relief and Assessment of Blocked Drain & Sewer Service Pipe/Connection by Trenchless CIPP Rehabilitation for Toronto Water District Operation (City Wide)
Attribué, 8 mai 2025
All labour, equipment and materials to add trenchless sewer rehabilitation at Carp Road.
Attribué, 1 janv. 2025
All labour, materials and equipment to undertake the Gladstone Bridge repairs.
Attribué, 1 juill. 2024
All labour, equipment and materials for the trenchless sewer rehabilitation program.
Attribué, 1 juill. 2024
All labour, equipment and materials for outstanding work for concrete investigations in the LRT tunnel.
Attribué, 1 janv. 2024
All labour, equipment and materials to undertake the renewal of the Airport Parkway overpass at Uplands Drive.
Attribué, 1 janv. 2024
Interim Repairs to existing Roadside Safety Treatments on the Allen Road, NORTH YORK DISTRICT, WARDS 6, 8
Attribué, 23 oct. 2023
2594247934
Attribué, 1 déc. 2020
2300495478
Attribué, 13 mai 2020
This contract is a multi-year contract.
Attribué, 26 nov. 2019
CLEARWATER STRUCTURES INC (EQ754-201218/001/PWL~009)
Attribué, 11 oct. 2019
CLEARWATER STRUCTURES INC (EQ754-201218/001/PWL~008)
Attribué, 11 oct. 2019
CLEARWATER STRUCTURES INC (EQ754-201218/001/PWL~007)
Attribué, 11 oct. 2019
CLEARWATER STRUCTURES INC (EQ754-201218/001/PWL~006)
Attribué, 11 oct. 2019
CLEARWATER STRUCTURES INC (EQ754-201218/001/PWL~005)
Attribué, 11 oct. 2019
CLEARWATER STRUCTURES INC (EQ754-201218/001/PWL~004)
Attribué, 11 oct. 2019
CLEARWATER STRUCTURES INC (EQ754-201218/001/PWL~003)
Attribué, 11 oct. 2019
CLEARWATER STRUCTURES INC (EQ754-201218/001/PWL~002)
Attribué, 11 oct. 2019
CLEARWATER STRUCTURES INC (EQ754-201218/001/PWL~016)
Attribué, 11 oct. 2019
CLEARWATER STRUCTURES INC (EQ754-201218/001/PWL~015)
Attribué, 11 oct. 2019
CLEARWATER STRUCTURES INC (EQ754-201218/001/PWL~014)
Attribué, 11 oct. 2019
CLEARWATER STRUCTURES INC (EQ754-201218/001/PWL~013)
Attribué, 11 oct. 2019
CLEARWATER STRUCTURES INC (EQ754-201218/001/PWL~012)
Attribué, 11 oct. 2019
CLEARWATER STRUCTURES INC (EQ754-201218/001/PWL~011)
Attribué, 11 oct. 2019
CLEARWATER STRUCTURES INC (EQ754-201218/001/PWL~010)
Attribué, 11 oct. 2019