To prospective Suppliers to submit bids for the performance of the Work, as further described in Part 3 (DRAWINGS AND SPECIFICATIONS) and the Contract (the "Project").
City of Toronto
For sewer and maintenance hole rehabilitation for various locations with the City of Toronto, this work includes, but is not limited to, mainline sanitary, storm and combined gravity sewers rehabilitation using Cured-In-Place Pipe (CIPP) method or other City approved methods (for selective sewer(s)). The Project also includes miscellaneous pre-lining repairs to facilitate the mainline sewer lining works and other repairs within the same geographical area.
City of Toronto
Full length Trenchless Rehabilitation of Existing Circular Gravity Sewers and Related Works at Various Locations in the City of Toronto (Wards 1, 2, 8, 14, 19), this work includes, but is not limited to, mainline sanitary, storm and combined gravity sewers rehabilitation using Cured-In-Place Pipe (CIPP) method or other City approved methods (for selective sewer(s)).
City of Toronto
Request for Tender for Full Length Trenchless Rehabilitation of Existing Gravity Sewers and Related Works at Various Locations in the City of Toronto
City of Toronto
All labour, equipment and materials for the 2025 transit maintenance work emergency repairs at 11 locations.
City of Ottawa
250 k $
The following is a general, but not necessarily complete, description of the work to be constructed under the Contract. The list below is not intended to specify the order of construction/execution. The Works includes, but is not limited to, the following: • Emergency Relief and Assessment of Blocked Drain & Sewer Service Pipe/Connection by Trenchless CIPP Rehabilitation for Toronto Water District Operation (City Wide)
City of Toronto
5 M $
All labour, equipment and materials to add trenchless sewer rehabilitation at Carp Road.
City of Ottawa
396,2 k $
All labour, materials and equipment to undertake the Gladstone Bridge repairs.
City of Ottawa
257,2 k $