CanPursue

Recherche

  • Recherche
  • Occasions
  • Acheteurs
  • Fournisseurs
  • Contrats
  • Attributions

Intelligence

  • AperçuCompte requis
  • Listes de suiviCompte requis
  • PipelineCompte requis
  • IntelligenceCompte requis
Créer un compte gratuit

Connexion

⌘K
ENFR
BELOR CONSTRUCTION LTD — contrats gouvernementaux · CanPursue
Fournisseurs

BELOR CONSTRUCTION LTD

Observé
Suivre
Valeur observée
12,6 M $
Contrats
5
Attributions
0
Acheteurs
1
AperçuContratsAttributionsAcheteursCatégoriesActivité

Contrats récents

  • This RFT is an invitation by the City to prospective Suppliers to submit bids for the performance of the Work for Bridge Rehabilitation of Old Mill Road over pedestrian crossing (ID 636), as further described in Part 3 (DRAWINGS AND SPECIFICATIONS) and the Contract (the "Project").including but not limited to survey and layout; utility locates; and provision of access, protection, and support systems. It involves removal of existing elements such as duct bank covers, light fixtures, railings, asphalt, waterproofing, deteriorated concrete, walkway pavers, and selected portions of abutments, wingwalls, and toe walls. Existing utilities will be protected, temporary supports installed, and excavation carried out as required. Rehabilitation works include installation of new luminaires, concrete patching and crack injection, deck waterproofing and asphalt placement, staged refacing of abutments, and refacing of wingwalls and toe walls. The project also includes placement of granular backfill, reinstatement of walkways, salvage and reinstatement of armour stones and duct bank covers, and application of concrete sealer to rehabilitated elements.City of Toronto
  • Rehabilitation of Bridge ID045 Woodbine Avenue under Metrolinx RailCity of Toronto4,4 M $
  • The project involves the rehabilitation of the William R. Allen Road Underpass at Lawrence Avenue West (Bridge ID197) including but not limited to, substructure and superstructure repairs including paving and waterproofing, reconstruction of sidewalks and parapet/median barrier walls, replacement of expansion joints, installation of temporary signals and traffic/pedestrian control, new light poles and bases, concrete repairs including sealing and crack injection. As further described in Part 3 (DRAWINGS AND SPECIFICATIONS) and Part 2 the Contract (the Project).City of Toronto
  • Culvert Replacement of Martin Grove Road over Albion Creek (Site #633)City of Toronto7,3 M $
  • 2412012000City of Toronto920,2 k $

Concentration des acheteurs

100 % des contrats observés sont avec City of Toronto.

  • City of Toronto5