⌘K
EN
FR
ORIN CONTRACTORS CORP. Government Contracts in Canada · CanPursue
Suppliers
ORIN CONTRACTORS CORP.
Also known as: Orin Contractors Corp
Observed
Watch
Observed value
$9.1M
Contracts
5
Awards
1
Buyers
2
Overview
Contracts
Awards
Buyers
Categories
Activity
Recent wins
This RFT is an invitation by the City to prospective Suppliers to submit bidsfor the performance of the Work, which includes but is not limited to: proposed landscape enhancements including new children's playground equipment, new exercise area, new community garden, two new shade pergolas, new storage shed, new walking paths, new pond feature, three new drinking fountains, new urban farming facilities including plumbing, updated grading and irrigation, new benches, new planting and landscaping.
City of Toronto
This Request for Tender Provision of Contracting Services for Construction of Park Improvements at a new park located at 51 Sussex Ave for City of Toronto’s Parks & Recreation Division
City of Toronto
All labour, equipment and materials to undertake the Ottawa River Outfalls - Package 2B project.
City of Ottawa
$8.3M
2955171217
City of Toronto
$763K
Construction of the Bluffer’s Park East Washroom Improvements and Exterior Works The City is improving the east washroom and maintenance building in Bluffer’s Park. This project includes upgrades to the existing washroom and maintenance building and a new outdoor plaza, with amenities and landscaping. The existing building will be demolished and replaced with a new building. Due to the age of the existing building designated substances will be required to be mitigated before demolition begins. Refer to Designated Substance Survey which can be found in the Reference Section of Part 3 – Specifications and Drawings of the sourcing event in Ariba, forming part of the Contract Document. Bluffer’s Park East Washroom will be improved with the following: Phase 1 New all-season gender-inclusive and accessible washrooms • Administrative and support spaces for maintenance and operation staff including a garage • New mechanical/electrical/lighting systems that are net-zero carbon • Outdoor showers • Outdoor plaza with seating and bike parking Phase 2 • Accessible pathways within the landscape including to the beach • Play spaces • Plantings including shade trees, pollinator, and native species
City of Toronto