Construction of the Bluffer’s Park East Washroom Improvements and Exterior Works The City is improving the east washroom and maintenance building in Bluffer’s Park. This project includes upgrades to the existing washroom and maintenance building and a new outdoor plaza, with amenities and landscaping. The existing building will be demolished and replaced with a new building. Due to the age of the existing building designated substances will be required to be mitigated before demolition begins. Refer to Designated Substance Survey which can be found in the Reference Section of Part 3 – Specifications and Drawings of the sourcing event in Ariba, forming part of the Contract Document. Bluffer’s Park East Washroom will be improved with the following: Phase 1 New all-season gender-inclusive and accessible washrooms • Administrative and support spaces for maintenance and operation staff including a garage • New mechanical/electrical/lighting systems that are net-zero carbon • Outdoor showers • Outdoor plaza with seating and bike parking Phase 2 • Accessible pathways within the landscape including to the beach • Play spaces • Plantings including shade trees, pollinator, and native species | Government contract · CanPursue
Contracts

Construction of the Bluffer’s Park East Washroom Improvements and Exterior Works The City is improving the east washroom and maintenance building in Bluffer’s Park. This project includes upgrades to the existing washroom and maintenance building and a new outdoor plaza, with amenities and landscaping. The existing building will be demolished and replaced with a new building. Due to the age of the existing building designated substances will be required to be mitigated before demolition begins. Refer to Designated Substance Survey which can be found in the Reference Section of Part 3 – Specifications and Drawings of the sourcing event in Ariba, forming part of the Contract Document. Bluffer’s Park East Washroom will be improved with the following: Phase 1 New all-season gender-inclusive and accessible washrooms • Administrative and support spaces for maintenance and operation staff including a garage • New mechanical/electrical/lighting systems that are net-zero carbon • Outdoor showers • Outdoor plaza with seating and bike parking Phase 2 • Accessible pathways within the landscape including to the beach • Play spaces • Plantings including shade trees, pollinator, and native species

City of TorontoORIN CONTRACTORS CORP.5098158970
Open official sourceWatch
Total contract value
Not reported
Original award value
No original award record in the source
Start
—
End
—

Timeline

Official
    Contract number
    5098158970
    Awarded
    —
    Instrument
    —
    Status
    —
    Amendments
    0 amendments
    Source
    City of Toronto (Open official source)
    5098158970
    Related procurement