Please see Ariba event for full details: https://discovery.ariba.com/rfx/23211819 If you do not have a current SAP Ariba account and are not registered with the City of Toronto as a supplier, you can begin the process of creating an account here http://toronto.sourcing.ariba.com/ad/selfRegistration and submit a Supplier Request.
City of Toronto
This contract includes Work at three (3) Sewage Pumping Stations (SPS) including forcemain works in the City of Toronto, namely, Fallingbrook SPS, Greyabbey SPS, and Humber SPS. There are following Works, in general, to be performed at these SPS: Fallingbrook SPS forcemain: • Approximately 105m of 150mm diameter High Density Polyethylene (HDPE) sanitary forcemain replacement from the sewage pumping station to the existing Maintenance Hole at Fallingbrook Crescent, and • Processing, Structural, Electrical, Mechanical, and Instrumentation Work inside the Pumping Station. Greyabbey SPS forcemain: • Approximately 310m of twin 150mm diameter High Density Polyethylene (HDPE) sanitary forcemain replacement from 150m south of Fordover drive to 100m west of Fintona avenue. • Replacement of the existing discharge Maintenance Hole, and • Processing, Structural, Electrical, Mechanical, and Instrumentation Work inside the Pumping Station. Humber SPS forcemain: • Approximately 223m of twin 150mm diameter High Density Polyethylene (HDPE) sanitary forcemain replacement from the sewage pumping station to the existing Maintenance Hole at Brule Terrace, and • Replacement of the existing discharge Maintenance Hole. Additionally, this contract also includes in general: A pre-construction survey of all properties and CCTV inspection of existing sewers and maintenance holes prior to commencement of the Work, installation of new and/or removal of existing chambers, temporary bypassing of the SPS during the Work, testing and commissioning of the installed forcemains, and Permanent Restoration.
City of Toronto
This RFT is an invitation by the City to prospective Suppliers to submit bids for the performance of Basement Flooding Protection Program - Area 3 Fairbank Silverthorn Phase 2.The Scope of Work includes but not limited to : 1. Approx. 15.5 km length of new storm & upsizing of combined sewers 2. Installation of approximately 275 Inlet Control Devices (ICDs) at catch basins 3. Upsizing of 2 local watermains - 1.2km length in the project area
City of Toronto
$65.9M
Sanitary Sewers upgrades are the following: - 271 m of sanitary sewer on Westgate Ravine Sidewalk construction are the following: - 150 m of sidewalk on Shaftesbury Street a. Within the past seven (7) years, Suppliers must have achieved Substantial Performance, as defined in the Construction Act, as the lead contractor on municipal infrastructure contracts meeting the following criteria: 1. Two (2) projects at least $1 million Canadian Dollars each in Final Contract Price (excluding taxes) with construction works in urban settings, with the locations identified (including major intersection, city/town, and province). 2. One (1) project with installation of sewer by trenchless tunneling method for a minimum of 50 linear metres and minimum 675mm diameter pipe or a retained subcontractor meeting this requirement. 3. One (1) project with watermain installation (≥250 mm diameter), including water services installation and/or replacement. 4. Two (2) projects of at least $1 million Canadian Dollars each in Final Contract Price (excluding taxes) with at least two (2) of the following three (3) work types: sewers, watermains, and transportation road work. 5. One (1) construction project in Type 4 soils (as classified in O. Reg. 213/91, s. 226 (5)) requiring trench wall support structures. 6. One (1) project with roadway pavement, curb and sidewalk restoration and construction. 7. One (1) project which required temporary diversion of sewer flows, water services and sewer laterals while maintaining flows and services to properties. 8. One (1) project which required the removal, management and disposal of designated/hazardous materials, including asbestos. AND b. Mandatory experience criteria for key staff on this project (Project Managers and Superintendents) are as follow: 1. One (1) Project Manager with: a. A minimum of five (5) years of experience as a “Project Manager” in municipal infrastructure projects, and b. A degree in engineering or a diploma in engineering technology. 2. Two (2) superintendents, one (1) with a minimum of ten (10) years of experience in municipal infrastructure construction. 3. In addition to meeting the definition of Qualified Person under O.Reg. 153/04 and O.Reg. 406/19, one (1) Contractor’s Qualified Person (QP) with the following qualifications: a. A minimum 10 years of work-related soil management experience for projects of similar size, scope, and complexity to the Work; b. A current licence in good standing with a public body within the province of Ontario such as Professional Engineers of Ontario or Professional Geoscientists of Ontario; c. Knowledge of Environmental Protection Act (Ontario), O. Reg. 153/04 and O. Reg. 406/19; d. Knowledge of relevant federal and Ontario environmental policies, procedures and legislation/regulations; e. Experience liaising with other speciality consultants, contractors, agencies, and governmental authorities; and, f. Experience with similar projects in the province of Ontario related to excess soil. Suppliers must complete the key staff experience fields in Ariba. Suppliers must also upload resumes for each of the four (4) key staff (one project manager, two superintendents and one Contractor’s QP as per above) to demonstrate that the mandatory experience and qualification criteria have been met.
Storm Sewers upgrades are the following: - 309 m of storm sewer on Bennington Heights Dr - 163 m of storm sewer on Brendan Rd - 156 m of storm sewer on Burnham Rd - 221 m of storm sewer on Heath St E - 112 m of storm sewer on Lumley Ave - 50 m of storm sewer on Moorehill Dr - 132 m of storm sewer on Plateau Cres - 68 m of storm sewer on Farmcote Rd - 37 m of storm sewer on Hermit Crt - 188 m of storm sewer on Swiftdale Pl - 155 m of storm sewer on Yewfield Cres Sanitary Sewers upgrades are the following: - 86 m of sanitary sewer on Bennington Heights Dr - 19 m of sanitary sewer on Brendan Rd - 163 m of sanitary sewer on Burnham Rd - 148 m of sanitary sewer on Heath St E - 122 m of sanitary sewer on Lumley Ave - 106 m of sanitary sewer on Plateau Cres - 84 m of sanitary sewer on Farmcote Rd - 155 m of sanitary sewer on Yewfield Cres
City of Toronto
$11M
1520190000
City of Toronto
$9.9M
2032018000
City of Toronto
$6.7M
3052017000
City of Toronto
$6M
City of Toronto