This contract includes Work at three (3) Sewage Pumping Stations (SPS) including forcemain works in the City of Toronto, namely, Fallingbrook SPS, Greyabbey SPS, and Humber SPS. There are following Works, in general, to be performed at these SPS: Fallingbrook SPS forcemain: • Approximately 105m of 150mm diameter High Density Polyethylene (HDPE) sanitary forcemain replacement from the sewage pumping station to the existing Maintenance Hole at Fallingbrook Crescent, and • Processing, Structural, Electrical, Mechanical, and Instrumentation Work inside the Pumping Station. Greyabbey SPS forcemain: • Approximately 310m of twin 150mm diameter High Density Polyethylene (HDPE) sanitary forcemain replacement from 150m south of Fordover drive to 100m west of Fintona avenue. • Replacement of the existing discharge Maintenance Hole, and • Processing, Structural, Electrical, Mechanical, and Instrumentation Work inside the Pumping Station. Humber SPS forcemain: • Approximately 223m of twin 150mm diameter High Density Polyethylene (HDPE) sanitary forcemain replacement from the sewage pumping station to the existing Maintenance Hole at Brule Terrace, and • Replacement of the existing discharge Maintenance Hole. Additionally, this contract also includes in general: A pre-construction survey of all properties and CCTV inspection of existing sewers and maintenance holes prior to commencement of the Work, installation of new and/or removal of existing chambers, temporary bypassing of the SPS during the Work, testing and commissioning of the installed forcemains, and Permanent Restoration. | Government contract · CanPursue
Contracts

This contract includes Work at three (3) Sewage Pumping Stations (SPS) including forcemain works in the City of Toronto, namely, Fallingbrook SPS, Greyabbey SPS, and Humber SPS. There are following Works, in general, to be performed at these SPS: Fallingbrook SPS forcemain: • Approximately 105m of 150mm diameter High Density Polyethylene (HDPE) sanitary forcemain replacement from the sewage pumping station to the existing Maintenance Hole at Fallingbrook Crescent, and • Processing, Structural, Electrical, Mechanical, and Instrumentation Work inside the Pumping Station. Greyabbey SPS forcemain: • Approximately 310m of twin 150mm diameter High Density Polyethylene (HDPE) sanitary forcemain replacement from 150m south of Fordover drive to 100m west of Fintona avenue. • Replacement of the existing discharge Maintenance Hole, and • Processing, Structural, Electrical, Mechanical, and Instrumentation Work inside the Pumping Station. Humber SPS forcemain: • Approximately 223m of twin 150mm diameter High Density Polyethylene (HDPE) sanitary forcemain replacement from the sewage pumping station to the existing Maintenance Hole at Brule Terrace, and • Replacement of the existing discharge Maintenance Hole. Additionally, this contract also includes in general: A pre-construction survey of all properties and CCTV inspection of existing sewers and maintenance holes prior to commencement of the Work, installation of new and/or removal of existing chambers, temporary bypassing of the SPS during the Work, testing and commissioning of the installed forcemains, and Permanent Restoration.

City of TorontoDrainstar Contracting Ltd5006610301
Open official sourceWatch
Total contract value
Not reported
Original award value
No original award record in the source
Start
Jul 23, 2025
End
—

Timeline

Official
  • AwardedJul 23, 2025
Contract number
5006610301
Awarded
Jul 23, 2025
Instrument
—
Status
—
Amendments
0 amendments
Source
City of Toronto (Open official source)