CanPursue

Recherche

  • Recherche
  • Occasions
  • Acheteurs
  • Fournisseurs
  • Contrats
  • Attributions

Intelligence

  • AperçuCompte requis
  • Listes de suiviCompte requis
  • PipelineCompte requis
  • IntelligenceCompte requis
Créer un compte gratuit

Connexion

⌘K
ENFR
Transport Dupuis & Dupuis Inc. — contrats gouvernementaux · CanPursue
Fournisseurs

Transport Dupuis & Dupuis Inc.

Aussi connu sous: TRANSPORT DUPUIS & DUPUIS INC., Transport Dupuis & Dupuis Inc.Observé
Suivre
Valeur observée
6,1 M $
Contrats
16
Attributions
15
Acheteurs
6
AperçuContratsAttributionsAcheteursCatégoriesActivité
  • Remplacement conduite sous la baie de GaspéAttribué, 2 nov. 2026
  • Remplacement conduite sous la baie de GaspéAttribué, 2 nov. 2026
  • Déneigement (2026-2027), Établissements du CSS des Chic-ChocsAttribué, 16 juin 2026
  • 6312-26-0901 - Remplacement de 2 ponceaux sur la route 132 (Bas-Saint-Laurent-Gaspésie-Îles-de-la-Madeleine)Attribué, 12 juin 2026
  • 6312-26-0901 - Remplacement de 2 ponceaux sur la route 132 (Bas-Saint-Laurent-Gaspésie-Îles-de-la-Madeleine)Attribué, 12 juin 2026
  • Déneigement (2026-2027), Établissements du CSS des Chic-ChocsAttribué, 26 mai 2026
  • Déneigement de la Maison des Aînés de Rivière-au-RenardAttribué, 20 juin 2025
  • Déneigement de la Maison des Aînés de Rivière-au-RenardAttribué, 20 juin 2025
  • 6312-25-0902 - Remplacement de 5 ponceaux sur la route 132. (Percé)Attribué, 23 mai 2025
  • 6312-25-0902 - Remplacement de 5 ponceaux sur la route 132. (Percé)Attribué, 23 mai 2025
  • Miscellaneous Manufactured ArticlesAttribué, 10 mars 2025
  • Service d'excavation, de location d'équipements d'asphalte - Bris conduite d'égoutAttribué, 3 mars 2025
  • Service d'excavation, de location d'équipements d'asphalte - Bris conduite d'égoutAttribué, 3 mars 2025
  • Déneigement de la Maison des Aînés de Rivière-au-RenardAttribué, 16 août 2024
  • Déneigement de la Maison des Aînés de Rivière-au-RenardAttribué, 16 août 2024
  • Parks Canada Agency (PCA) is currently developing a project to restore an old section of Route 132 that was abandoned in 2014 in favour of an alternative route that is currently in use, in the Beaver sector of Forillon National Park. The project aims to renaturalize the vast majority of the 5.9 kilometers of abandoned road to reconnect the forest and aquatic environments located on either side of this former road corridor. It will reduce terrestrial connectivity problems for carnivores such as American marten and fisher, as well as aquatic connectivity by removing a dozen culverts to ensure the free passage of fish, including American eel. Ultimately, the project also aims to increase the area of natural habitat by reducing the area of disturbed habitat, so as to enable the population or visitors to the national park to reap the benefits.​Attribué, 14 mai 2024
  • Roads, Highways and Airport RunwaysAttribué, 10 oct. 2023
  • Other Engineering WorksAttribué, 18 sept. 2023
  • Parc National Forillon – Installation de panneaux de signalisation aux approches de l’intersection route 132 / route d’accès au Centre OpérationnelAttribué, 14 sept. 2023
  • Branchement aqueduc et égout - Secteur Hôtel de villeAttribué, 5 sept. 2023
  • Branchement aqueduc et égout - Secteur Hôtel de villeAttribué, 5 sept. 2023
  • Branchement aqueduc et égout - Secteur Hôtel de villeAttribué, 5 sept. 2023
  • 0291S2326_AO_Saint-PaulAttribué, 17 juill. 2023
  • 0291S2326_AO_Saint-PaulAttribué, 17 juill. 2023
  • 0291S2326_AO_Saint-PaulAttribué, 17 juill. 2023
  • travaux suite à l'inondationAttribué, 10 sept. 2021
  • Collecte des encombrant et gros rebuts - Ville de Gaspé pour 2021-2022-2023Attribué, 19 avr. 2021
  • Snow removalAttribué, 20 nov. 2019
  • Miscellaneous Manufactured ArticlesAttribué, 30 avr. 2019
  • TRANSPORT DUPUIS & DUPUIS INC (5P203-181011/001/QCN~000)Attribué, 30 avr. 2019