⌘K
EN
FR
SIMPSON GUMPERTZ & HEGER INC — contrats gouvernementaux · CanPursue
Fournisseurs
SIMPSON GUMPERTZ & HEGER INC
Observé
Suivre
Valeur observée
494,5 k $
Contrats
9
Attributions
0
Acheteurs
2
Aperçu
Contrats
Attributions
Acheteurs
Catégories
Activité
Professional engineering services to undertake a failure risk analysis for the St. Joseph A Watermain.
Attribué, 1 juill. 2025
Professional engineering services to perform failure risk analysis and repair prioritization of distressed pipes in the Robertson Watermain.
Attribué, 1 janv. 2025
Professional engineering services to undertake failure risk analysis and repair prioritization of distressed pipes in the Britannia A and B Watermains.
Attribué, 1 juill. 2024
Professional engineering services to undertake evaluation of the impact of infill at the LRT Phase II Train Tracks and Guideway Crossing of Holly Acres Sanitary Sewer Pump Station Forcemains.
Attribué, 1 janv. 2024
Professional engineering services to undertake failure risk analysis and repair prioritization of distressed pipes in the Ottawa Orleans B Water Main
Attribué, 1 janv. 2024
Professional engineering services to undertake structural evaluation and failure risk analysis of the Ottawa South A Watermain.
Attribué, 1 juill. 2023
Professional engineering services to undertake structural evaluation and failure risk analysis of the Eagleson B Watermain.
Attribué, 1 juill. 2023
Professional engineering services to undertake a structural evaluation and load analysis of the Ottawa South A Watermain for sediment removal from the Sawmill Pond.
Attribué, 1 juill. 2023
Strawberry Creek RFP Assistance
Attribué, 4 mars 2020