| Dossier | Acheteur | Valeur | Attribué |
|---|---|---|---|
| All labour, equipment and material for the replacement of two sewage pumps and control panel at 110 Laurier Avenue for Facility Operations Services.41725-91060-C01 | City of Ottawa | 38 601,24 $ | 1 juill. 2025 |
| All labour, equipment and materials to perform storm pump replacement at 100 Malvern Drive.41824-91060-C01 | City of Ottawa | 49 550 $ | 1 juill. 2024 |