⌘K
EN
FR
LAURENT LEBLANC LIMITED — contrats gouvernementaux · CanPursue
Fournisseurs
LAURENT LEBLANC LIMITED
Observé
Suivre
Valeur observée
8,1 M $
Contrats
21
Attributions
0
Acheteurs
2
Aperçu
Contrats
Attributions
Acheteurs
Catégories
Activité
EMERGENCY WORK - to provide Excavating and Earth moving Work at NDMC, 1745 Alta Vista Drive, Ottawa, ON
Attribué, 24 sept. 2025
All labour, equipment and materials to perform the 2025 speed humps project.
Attribué, 1 juill. 2025
All labour, equipment and materials for the manhole replacement at Southmore Drive.
Attribué, 1 juill. 2025
All labour, materials and equipment to undertake repairs to the Richmond Drive storm sewer.
Attribué, 1 juill. 2025
All labour, materials and equipment to undertake the culvert cave-in repair at 1837 Joly Street.
Attribué, 1 juill. 2025
All labour, materials and equipment to undertake the Leitrim storm sewer replacement.
Attribué, 1 juill. 2025
All labour, materials and equipment to undertake asphalt and catch basin repairs at Brewer Park.
Attribué, 1 juill. 2025
All labour, materials and equipment to install a concrete apron around catch basin behind Jasmine Crescent.
Attribué, 1 janv. 2025
All labour, equipment and materials for the 6213 Jeanne D'Arc Boulevard - Fire Station 52 Water Service Line project.
Attribué, 1 janv. 2025
All labour, equipment and materials for pipe replacement at Lloyd Graham Avenue.
Attribué, 1 janv. 2025
All labour, equipment and materials for the manhole repair and sewer pipe installation at the intersection of Sherwood Drive and Fairmont Avenue.
Attribué, 1 juill. 2024
All labour, materials and equipment to undertake the Maple Avenue sewer repair.
Attribué, 1 juill. 2024
All labour, materials and equipment to undertake reconstruction of a top manhole on the Vanier Parkway.
Attribué, 1 juill. 2024
All labour, materials and equipment to undertake repairs on Trim Road.
Attribué, 1 juill. 2024
All labour, equipment and materials for the installation of Cathodic Protection for a one-year period and four one-year optional extension periods.
Attribué, 1 janv. 2024
All labour, equipment and materials for the disposal of excess soil from various maintenance hole and catch basin repairs.
Attribué, 1 juill. 2023
All labour, equipment and materials to perform the expedited access road installations project CP000845.
Attribué, 1 juill. 2023
All labour, equipment and materials for the disposal of excess soil from maintenance hole and catch basin repairs.
Attribué, 1 juill. 2023
Supply and install new valve box with on-off indicator at 1745 alta vista
Attribué, 2 déc. 2022
Office Buildings
Attribué, 8 juill. 2022
Office buildings
Attribué, 3 sept. 2021