CanPursue

Recherche

  • Recherche
  • Occasions
  • Acheteurs
  • Fournisseurs
  • Contrats
  • Attributions

Intelligence

  • AperçuCompte requis
  • Listes de suiviCompte requis
  • PipelineCompte requis
  • IntelligenceCompte requis
Créer un compte gratuit

Connexion

⌘K
ENFR
BRIDGECON CONSTRUCTION LTD — contrats gouvernementaux · CanPursue
Fournisseurs

BRIDGECON CONSTRUCTION LTD

Observé
Suivre
Valeur observée
45,4 M $
Contrats
17
Attributions
0
Acheteurs
1
AperçuContratsAttributionsAcheteursCatégoriesActivité

Contrats récents

  • Request for Tenders for Enhanced Safety Barrier Leaside Bridge (Millwood Rd) This Contract entails the installation of Enhanced Safety Barriers on Leaside Bridge (ID105). The scope of work includes, but is not limited to the following: • Install temporary cyclist and pedestrian control measures on Millwood Road for the duration of construction, in accordance with the Ontario Traffic Manual Book (OTM 7), latest revision. • Design, supply, install, maintain and remove suggested debris platform as shown on the Contract Drawings, protective measures and/or other necessary measures before any construction works begin. • Remove existing railing, posts, bolts, nuts and washers and baseplates on parapet walls. Cut anchor bolts flush with top of concrete. Coat exposed anchor bolts with Galva‑Guard advanced zinc galvanizing touch‑up solder or approved equivalent. • Remove all loose and unsound concrete, including major spalls and delaminated areas, from the top of the parapet wall. Limits of removal to be confirmed during railing removal by the Contract Administrator. • Install new Enhanced Safety Barriers including curved posts, mesh fencing and associated components. • Form and patch top of parapet wall with new concrete. • Restore the site, carry out clean-up, and demobilize all equipment and materials. • All other works as shown on the Contract Drawings and Documents.City of Toronto
  • Governor's Road Over Moore Park Ravine Bridge Rehabilitation (ID521)City of Toronto5,8 M $
  • Request for Tender for Bridge Rehabilitation of Brock Avenue under Metrolinx Rail (Bridge ID504), Dupont Street under Metrolinx Rail (Bridge ID522) and West Toronto Rail path over Bloor Street (Bridge ID061) RFT response deadline August 9, 2024 12:00 PM Toronto Local Time. The City of Toronto does not post budget information. The opportunity amount listed does not reflect the City's actual project estimate. Please disregard the Ariba Discovery posting response deadline closing time. All required supporting documentation and bid submission must be submitted by August 9,2024 at 12:00 PM NOON local Toronto time. All bids submitted after 12:00 PM NOON local Toronto time will result in the bid being declared non-compliant. Posting link: https://discovery.ariba.com/rfx/20325609City of Toronto7,7 M $
  • This Request for Tender (the "RFT") is an invitation by the City of Toronto (the "City") to prospective Suppliers to submit bids for: Rehabilitation of McCowan Road over Highland Creek for the City of Toronto Infrastructure & Development Services Division. The scope of work includes, but is not limited to the substructure repairs, replacement of bridge bearings, repairs to expansion joints and rehabilitation of wingwalls, abutments and parapet walls.City of Toronto4,2 M $
  • 3380260173City of Toronto4,7 M $
  • 6320190000City of Toronto2,9 M $
  • 6920190000City of Toronto3,6 M $
  • 1792016000City of Toronto917,8 k $

Concentration des acheteurs

100 % des contrats observés sont avec City of Toronto.

  • City of Toronto17