8th Street Sanitary Sewer Expansion
Attribué, 14 mars 2024
Sidewalk Replacement (Concrete) Redcliff Middle School
Attribué, 10 juill. 2023
Sidewalk Replacement on Three Roads in Valley, NS
Attribué, 31 mars 2023
Supply, installation of 200m of 150 mm watermain, 7m of 100mm watermain, 2 fire hydrants,curb
Attribué, 11 juill. 2022
Construction of concrete curb and sidewalk along town streets.
Attribué, 14 oct. 2021
installation of 142m of 150mm watermain, 1 fire hydrant and 3 tap tee connections, etc
Attribué, 28 juill. 2020
RIVER JOHN SIDEWALK REPLACEMENT 2019, PROJECT PC2019.01
Attribué, 21 oct. 2019
Hawthorne St Drainage Upgrades-removal of existing curb in designated areas, replace and storm pipe