Clearway Construction Inc. Government Contracts in Canada · CanPursue
Suppliers

Clearway Construction Inc.

Also known as: Clearway Construction Inc.Observed
Watch
Observed value
$205M
Contracts
34
Awards
2
Buyers
6
OverviewContractsAwardsBuyersCategoriesActivity
  • Contractor Prequalification for Street and Civil WorksAwarded, Sep 3, 2025
  • CONSTRUCTION SERVICES - FRASER STREET OUTFALL REPLACEMENTAwarded, Jul 22, 2025
  • This Request for Tenders is an invitation by the City of Toronto to prospective Suppliers to submit bids for the construction of a new connection to the Scott Street Pumping Station and Incoming Sewer.Awarded, May 7, 2025
  • Construction Services for Sewer and Other Utility Work - Contractor PrequalificatiAwarded, Dec 1, 2024
  • Project Description - In general, the work to be completed on University Avenue includes: • Replacement of the existing 300 mm and 600 mm diameter watermains across Dundas Street West using Cap and Lag or approved equivalent trenchless method • Replacement of the existing 150 mm diameter Cast Iron (CI) watermain (1876) with a new 300 mm diameter Molecularly Oriented Polyvinyl Chloride (PVCO) watermain for a distance of approximately 930 m and water service transfer to new watermain from College Street to 120 m north of Queen Street West. • Replacement of the existing 600 mm diameter CI watermain (1873) with a new 600 mm diameter butt welded steel pipe with concrete encasement and cement lining watermain for a distance of approximately 930 m from College Street to 120 m north of Queen Street West. • Transfer water service to new watermain. • Replacement of all substandard water services. • Major road resurfacing between College Street to 120 m north of Queen Street West, from curb-to curb, including all required traffic control, drainage, curb alignment modification, and any other requirements to facilitate road resurfacing works. • Intersection improvements and bikeway improvements from College Street to Dundas Street West • Road Classification: MajorAwarded, Oct 30, 2024
  • This contract includes Work at two (2) Sewage Pumping Stations (SPS) in the City of Toronto, namely, Island Road SPS and Skydome SPS. There are the following Works, in general, to be performed at these SPS:,Island Road SPS:,- Approximately 272 m of Twin 200 mm diameter Forcemains installation on Island Road from the SPS to the proposed Discharge Maintenance Hole at Brownfield Gardens, and,- Processing, Structural, Electrical, Mechanical, and Instrumentation Work inside the Pumping Station.,Skydome SPS:,- Approximately 190 m of 300 mm diameter of Primary Forcemain on Navy Wharf Ct and Blue Jays Way including proposed Discharge Maintenance Hole, and Valve Chambers,,- Approximately 100 m of Twin 350 mm diameter Forcemains on Blue Jays Way including the installation at the underside of the Bridge over the Metrolinx Tracks and Expansion Joint Chambers, and,- Processing, Structural, and Electrical Work inside the Pumping Station.,Additionally, this contract also includes in general: A pre-construction survey of all properties and CCTV inspection of existing sewers and maintenance holes prior to the commencement of the Work, abandonment and/or removal of existing pipes, temporary bypassing of the SPS during the Work, testing and commissioning of the installed forcemains, and Permanent Restoration.Awarded, Apr 17, 2024
  • Marine installationsAwarded, Feb 15, 2024
  • F1700-230184 – Saltwater Intake and Pumphouse UpgradeAwarded, Nov 7, 2023
  • F1700-230184 – Saltwater Intake and Pumphouse UpgradeAwarded, Nov 7, 2023
  • ARIBA Doc3952617137 - Request for Supplier Qualifications to qualify for the provision of construction services for the L'Amoreaux Kidstown Waterpark Redevelopment. All interested Respondents are invited to submit a Response for future eligibility to provide construction services for the upcoming L'Amoreaux Kidstown Waterpark Redevelopment project.Awarded, Sep 6, 2023
  • This contract includes Work at three (3) Sewage Pumping Stations (SPS) in the City of Toronto, namely, Cumber SPS, Mimico SPS, and New Toronto SPS. There are following Works, in general, to be performed at these SPS: • Cumber SPS: o Approximately 443 m of Twin 600 mm diameter Forcemains installation on Lawrence Avenue East from the SPS to the proposed Discharge Maintenance Hole including new Valve Chamber installation and replacement of the existing Valve Chamber, and o Processing, Structural, Electrical, Mechanical, and Instrumentation Work inside the Pumping Station. • Mimico SPS: Approximately 20 m of Twin 600 mm diameter Forcemains installation including replacement of the existing Valve Chamber, o New Valve Chamber installations on the existing 600 mm diameter Forcemains at Albert Avenue and Cavell Avenue intersection, and o Processing, Structural, Electrical, Mechanical, and Instrumentation Work inside the Pumping Station. New Toronto SPS: o Approximately 22 m of Twin 500 mm diameter Forcemains installation including replacement of existing valves, o New Valve Chamber installation on the existing 500 mm diameter Forcemain at Morrison Street and Eleventh Street, and o Processing, Structural, Electrical, Mechanical, and Instrumentation Work inside the Pumping Station. Additionally, this contract also includes in general: A pre-survey of all properties and CCTV inspection of existing sewers and maintenance holes prior to commencement of the Work, installation of new and/or removal of existing chambers, replacement of valves, abandonment and/or removal of the existing pipes, temporary bypassing of the SPS during the Work, testing and commissioning of the installed forcemains, and Permanent Restoration. Additionally, this contract also includes in general: A pre-survey of all properties and CCTV inspection of existing sewers and maintenance holes prior to commencement of the Work, installation of new and/or removal of existing chambers, replacement of valves, abandonment and/or removal of the existing pipes, temporary bypassing of the SPS during the Work, testing and commissioning of the installed forcemains, and Permanent Restoration.Awarded, Aug 21, 2023
  • Other engineering worksAwarded, Jun 20, 2023
  • CCIW Lift Station UpgradeAwarded, Jun 7, 2023
  • CCIW Lift Station UpgradeAwarded, Jun 7, 2023
  • 3091578742Awarded, Nov 10, 2021
  • 3907197027Awarded, Oct 29, 2020
  • 2132019000Awarded, Jun 10, 2020
  • Non-competitive contract: EmergencyAwarded, Mar 13, 2020
  • 2542018000Awarded, Dec 12, 2019
  • 2420180000Awarded, Oct 2, 2018
  • Non-competitive contract: EmergencyAwarded, Apr 29, 2016
  • 3907157136Awarded, Apr 11, 2016
  • 3402014000Awarded, Mar 10, 2016
  • 3042015000Awarded, Mar 3, 2016
  • 1592015000Awarded, Aug 5, 2015
  • 3482014000Awarded, Jul 8, 2015
  • Non-competitive contract: EmergencyAwarded, May 12, 2015
  • 3122014000Awarded, Feb 26, 2015
  • 1922014000Awarded, Nov 6, 2014
  • Construction Work - Civil EngAwarded, Sep 2, 2014