| For Full length Trenchless Rehabilitation of Existing Circular Gravity Sewers and Related Works at Various Locations in the City of Toronto, Wards 15, 16, 17, 18, 20, 21, 22, 23, 24, and 25.4445258694 | City of Toronto | $12.9M | Oct 8, 2024 |
| For Full length Trenchless Rehabilitation of Existing Circular Gravity Sewers and Related Works at Various Locations in the City of Toronto, Wards 15, 16, 17, 18, 20, 21, 22, 23, 24, and 25.4445258694 | City of Toronto | $12.9M | Aug 7, 2024 |
| Request for Tender for Full Length Trenchless Rehabilitation of Existing Gravity Sewers and Related Works at Various Loc4355917968 | City of Toronto | $8.7M | Jun 6, 2024 |
| This RFT is for prospective Suppliers to submit bids for the performance of the Work for Full Length Trenchless Rehabilitation of Existing Gravity Sewers and Related Works at Various Locations, as further described in Part 3 (DRAWINGS AND SPECIFICATIONS) Detailed requirements of the RFT are described in Part 3 Drawings and Specifications.4355917968 | City of Toronto | $8.7M | Jun 6, 2024 |
| The following is a general, but not necessarily complete, description of the work: Full Length Trenchless Rehabilitation of Existing Gravity Sewers and Related Works at Various Locations in Wards 1, 2, 5, 6, 8, 9, 12, 18, 19, and 20 in the City of Toronto. This Project includes mainline sewer rehabilitation for large diameter circular and non-circular gravity sewers using cured-in-place pipe (CIPP) method or other approved trenchless methods at various locations in the City of Toronto. The Project also includes miscellaneous pre-lining repairs to facilitate the mainline sewer lining works and other repairs within the same geographical area. The Work shall be completed in accordance with City's standard specifications, special/supplementary specifications and special provisions.3978905389 | City of Toronto | $9.4M | Oct 4, 2023 |
| Trenchless Sewer Lining ContractorsRFSQ02.2022 | Halifax Water | — | May 30, 2023 |
| 36077153513607715351 | City of Toronto | $23M | Jan 10, 2023 |
| Full Length Trenchless Rehabilitation of Existing Gravity Sewers and Related Works at various locations in Wards 6, 11, 13, 13, 15, 16, 18, 19, 21, 24, and 25 in the City of Toronto The scope of work includes, but not limited to, the following: The scope of work includes: • CCTV inspection • Flushing and mechanical cleaning • Cured-In Place Pipe (CIPP) • Excavated or trenchless point repairs • Connection cutting, cleaning, grouting or replacement • Lateral or black lateral replacement • Various manhole cleaning, adjustments and repairs • Sampling and testing3513810553 | City of Toronto | $6M | Oct 12, 2022 |
| 31988211903198821190 | City of Toronto | $5M | Sep 14, 2022 |
| 31000817713100081771 | City of Toronto | $1.3M | Dec 15, 2021 |
| Services d'égouts sur 495 Cherrier - Facture QC2025-31463452 | Ville de Montréal | $4,593.20 | May 31, 2021 |
| 29060913742906091374 | City of Toronto | $75,191.50 | May 17, 2021 |
| 28280214462828021446 | City of Toronto | $2.9M | May 12, 2021 |
| Services d'égouts sur 495 Cherrier - Facture QC2025-31463452 | Ville de Montréal | $3,737.55 | Mar 19, 2021 |
| 25490840752549084075 | City of Toronto | $10.3M | Dec 16, 2020 |
| Services d'égouts sur 495 Cherrier1444005 | Ville de Montréal | $3,036.76 | Nov 30, 2020 |
| Services d'égouts sur divers adresses1443536 | Ville de Montréal | $7,357 | Nov 26, 2020 |
| Facture QC2023-1 - Travaux nettoyage et inspection par caméra -rues Dr Penfield et Redpath1425669 | Ville de Montréal | $11,338.65 | Aug 10, 2020 |
| Paiement de factures - Travaux de réparation, remplissage et inspection - Divers endroits (voir lignes au BC pour détails) - TP - Aqueduc (Jonathan Labonté)1420941 | Ville de Montréal | $34,868.97 | Jul 22, 2020 |
| Paiement de factures - Travaux de réparation, remplissage et inspection - Divers endroits (voir lignes au BC pour détails) - TP - Aqueduc (Jonathan Labonté)1420941 | Ville de Montréal | $73,821.96 | Jul 9, 2020 |
| Paiement de factures - Travaux de nettoyage, inspection et réparation collecteurs - Factures QC2009-4 et QC2009-3 - TP - Aqueduc1412969 | Ville de Montréal | $45,241.74 | May 20, 2020 |
| Paiement de facture -Travaux de nettoyage et inspection CCTV du Collecteur Peel entre la rue Ste-Catherine et boul. René-Lévesque - Facture QC2009-11410758 | Ville de Montréal | $22,606.43 | May 4, 2020 |
| Trois (3) soumissionnaires - Travaux de réhabilitation sans tranchée de la conduite d'égout UNITAIRE sous l'avenue Viger entre Clark et Saint-Laurent - Soumission 20200316 - TP - Aqueduc (Jonathan Labonté)1406717 | Ville de Montréal | $36,115.70 | Mar 25, 2020 |
| Travaux préparation de conduite d'égouts et murage rue De la Gauchetière et Dorion (soumission courriel du 17-01-2020) - TP - Aqueduc - Jonathan Labonté1396436 | Ville de Montréal | $4,724.44 | Mar 25, 2020 |
| Trois (3) soumissionnaires - Travaux de réhabilitation sans tranchée de la conduite d'égout UNITAIRE sous la rue Provençale entre le parc et la rue Dufresne - Soumission 20200310 - TP - Aqueduc (Jonathan Labonté)1405891 | Ville de Montréal | $44,670.08 | Mar 18, 2020 |
| Travaux de réhabilitation sans tranchée de la conduite d'égout UNITAIRE sous la rue Mayor entre la rue Aylmer et la rue City Councillors - Soumission 20200310- TP - Aqueduc (Jonathan Labonté) - Règles de rotation des fournisseurs vérifiées1405340 | Ville de Montréal | $24,934.53 | Mar 17, 2020 |
| 24920190002492019000 | City of Toronto | $23.3M | Mar 6, 2020 |
| Travaux préparation de conduite d'égouts et murage rue De la Gauchetière et Dorion (soumission courriel du 17-01-2020) - TP - Aqueduc - Jonathan Labonté1396436 | Ville de Montréal | $9,422.63 | Feb 3, 2020 |
| OCTROYER UN CONTRAT DE GRÉ A GRÉ POUR LE NETTOYAGE ET L'INSPECTION DE CONDUITE DU COLLECTEUR SAINTE-CATHERINEDEU40353 | Ville de Montréal | $88,976.90 | Jan 29, 2020 |
| 34201900003420190000 | City of Toronto | $21.7M | Dec 23, 2019 |