Create a free account and describe your company. With the trial, CanPursue checks every opportunity against it and explains the fit.
Create free accountCreate a free account to see past contracts like this one: who won and at what price.
Create free accountThe work under this contract involves the supply of all labour, materials, and equipment required to new shore bollards for the Confederation berth as detailed on the plans and in this specification. The work under this Contract includes but is not limited to: .1 Mobilization to site of necessary, equipment, materials, tools, site office and personnel to carry out the work as indicated in these tender documents, and demobilization upon completion of the work. .2 Site work including excavation, demolition and removals of existing concrete bollard structures, hauling and disposal offsite as required. .3 Supply, installation and maintenance of environmental controls required to complete the work. .4 Survey required to set location and elevation of new work as indicated on the drawings. .5 Construction of the two shallow concrete foundation and three (3) pipe bollards; pipe bollards are supplied by the client. .6 Construction of miscellaneous metals work including stairs, railings and mooring line pipe rails as shown on the drawings. .7 Reinstatement of existing site features to existing condition.
Not stated in the notice: procurement type, procurement method, selection criteria, region of delivery, region of opportunity, expected contract period, end user
No attachments listed in the open data.
No contact listed in the open data.