Create a free account and describe your company. With the trial, CanPursue checks every opportunity against it and explains the fit.
Create free accountCreate a free account to see past contracts like this one: who won and at what price.
Create free accountThe principal works to be executed and for which all materials, plant and labour are to be supplied by the Contractor are as shown in the plans and in the specifications. In general, the work includes, but not limited to the following: .1. The replacement of all nine (9) valve room equipment including dry valve, air compressor, accelerator valve, check valves main drain valves main water supply control valves and all appurtenances and connect to existing water meter which shall remain.2 The Work includes new base board heater for all nine (9) valve stations..3 Provide training operation and maintenance.4 All test required. The work is located at the multiple valve stations throughout Steveston Paramount Complex (12740 Trites Road, Richmond)
Not stated in the notice: procurement type, procurement method, selection criteria, region of delivery, region of opportunity, expected contract period, end user
The source reports 52 amendments. CanPursue observed 1 of them with dates.
No attachments listed in the open data.
No contact listed in the open data.