CanPursue

Research

  • Search
  • Opportunities
  • Buyers
  • Suppliers
  • Contracts
  • Awards

Intelligence

  • OverviewAccount required
  • WatchlistsAccount required
  • PipelineAccount required
  • IntelligenceAccount required
Create free account

Sign in

⌘K
ENFR
Irrigation Repair and Replacement | Alberta Agriculture and Irrigation · CanPursue
Opportunities
Fit is part of the trial and paid plans.ClosedRFP

Irrigation Repair and Replacement

Alberta Agriculture and Irrigation27AGI085Alberta
Open official sourceAdd to pipeline
Published
Oct 2, 2026
Respond by
Nov 6, 2026
Latest amendment
None

See how this opportunity fits your company

Create a free account and describe your company. With the trial, CanPursue checks every opportunity against it and explains the fit.

Create free account

Who won similar work

Create a free account to see past contracts like this one: who won and at what price.

Create free account

Description

Project Background: To maximize the irrigation potential of the land in the Brooks and Bow Island areas, we need to reorganize the placement of the linear pivots as well as demo old and repair irrigation line. Relocating the two linear pivots to the Brooks area would significantly increase the irrigated acreage, effectively doubling the irrigation capacity across the three locations. Access to irrigated land for agricultural research in Southern Alberta has been a high priority for researchers working with the County of Newell. Moving the linear pivots from the Bow Island property will also provide an opportunity to optimize the irrigation layout at that location. Improving the irrigation efficiency at all farm sites will make the land more attractive to lease and provide leaseholders with greater flexibility to irrigate as needed.

Project Objectives: The project will be broken down into 2 distinct phases. We would like to have a single contractor responsible for managing all aspects of this project.

Phase one of this project will include separating and moving two, seven tower linear pivots from SE 17-9-11-W4 (County of Forty Mile) to three separate field locations in the County of Newell near Brooks, AB. The two linear pivots will need to be separated and re-setup in 6 different fields with 5 fields requiring 2 towers and 1 field requiring a 3-tower set up. Once set up, each new installation will require a generator to operate it, a new panel, and a guidance system to direct it. The successful proposal will ensure to the best of their abilities which system set up will best match each field.

Once the site at SE 17-9-11-W4 is cleared of the linear pivot spans, the second phase will be to remove the existing mainline and electric service (approximately 700 m), remove and install a new mainline (approximately 350 m), new power from the pumphouse to the new pivot pad (approximately 350 m), new electrical panels and VFD, and new low pressure centre pivot. The design of the pivot and sprinkler package should be for no less than 1000 GPM. The centre pivot will be required to have GPS guidance and be set up to be operated remotely. It is anticipated that this will be a turnkey operation that maximizes the acres that the LPCP can cover.

All work to be completed after harvest (2026) and before seeding (2027).

Project Structure/Business Model: This project needs to be managed and maintained by the contractor awarded the bid. Changes and updates need to be communicated to the Contracting Manager and the CDC Project Coordinator. The project may need to have phase 1 and phase 2 happening concurrently. The winning proposal should outline clearly how they will ensure the timely completion of this project so that all areas will be able to be irrigated at the starting of the field season in 2027.

Key Stakeholders: The key stakeholders of this project are listed below: • Contractor • County of Newell • County of Forty Mile • Ministry of Infrastructure • Eastern Irrigation District • St. Mary’s Irrigation District • GOA on-site staff • Field Lease Holders

Related Project Documents: All documents will be available upon request during the suggested walk through to all interested parties creating a proposal to this RFP. We have access to original drawings for all sites as available.

Miscellaneous: Walk through of the removal of the linear pivots at SE 17-9-11-W4 will be available between 9 am and 2 pm on October 13, 2026. Please create the site visit time by contacting the Contracting Manager before October 12th, 2026.

Procurement

Procurement type
RFP
Procurement method
Competitive
Category
Services
Jurisdiction
Alberta

Not stated in the notice: selection criteria, region of delivery, region of opportunity, expected contract period, end user

Requirements and qualifications

Supply arrangement
Not stated in the public notice
Security requirement
Not stated in the public notice
Trade agreements
—
Limited tendering reason
—

Classification

GSIN
—
UNSPSC
  • 21000000
  • 21100000
  • 21102500
  • 39120000
  • 70000000
  • 70171700
  • +5 more

Amendments

No amendments observed.

Documents

No attachments listed in the open data.

Contact

No contact listed in the open data.

Related

More from this buyer

  • Laboratory Particle Size AnalyzerNov 13
  • Oldman River Dam - Evaluation of Data Anomalies Between Regular Slope Inclinometers and ORICA (Measurand) SAA Monitoring SystemsNov 16
  • Carolside Dam – Underwater Inspection and Condition Assessment of the Low-Level Outlet ConduitNov 16
  • Consultant Services for Program Area Infrastructure and Capital Equipment Condition AssessmentNov 16
  • Steam Jacketed Kettle MixerNov 17

Linked contracts

No related records observed.

Source

Open official source

Verify the notice and download the full solicitation on the official page.

Source
APC
Solicitation
27AGI085
Reference number
AB-2026-06638
Observed
Nov 6, 2026

Never miss an amendment

Track this opportunity in your pipeline and watchlists with a free account.

Create free account