Create free accountTitle New Containment Cell upgrade
Location Cap-Lumière, New-Brunswick
General Requirements In general, the work under this contract at Cap-Lumière harbour located in New-Brunswick covers, but is not limited to the following; furnishing of all labour, all products (i.e.: materials, machinery, equipment and appliances), all construction material and all services that may be necessary for the execution of the work in accordance with the contractual documents for the construction of a new containment cell at Cap-Lumiere, Kent County, New Brunswick.
The work covered by this contract includes, but is not limited to: 1 Removal of existing armour stone to excavation limit and disposal to the designated area; 2 Reshape the existing armour stone to suit the new berm construction; 3 Supply and placement of new corestone, filterstone and armourstone including geotextile shown on the drawing.
Contract includes mobilization and demobilization all equipment necessary to make work progress for the entire contract, including environmental controls and all associated items in strict accordance with specifications and accompanying drawings and subject to all terms and condition of this contract.
Familiarization with Site Before submitting a bid, it is recommended that bidders visit the site and its surroundings, at their own expense and schedule, to review and verify the form, nature and extent of the work, materials necessary for the completion of the works, the means of access to the site, severity, exposure and uncertainty of weather, soil conditions, any accommodations they may require, and in general shall obtain all necessary information as to risks, contingencies and other circumstances which may influence or affect their bid. No allowance shall be made subsequently in this connection on account of error or negligence to properly observe and determine the conditions that will apply.
Take all appropriate safety measures before conducting any visit to site.
All work must be substantially completed by May 2nd, 2026.
Not stated in the notice: procurement type, procurement method, selection criteria, region of delivery, region of opportunity, expected contract period, end user
The source reports 7 amendments. CanPursue observed 1 of them with dates.
No attachments listed in the open data.
No contact listed in the open data.