Create free accountThe elevation works for the COOP Wharf at L’Étang-du-Nord Fishing Harbour in the Magdalen Islands include, but are not limited to, the following work:
• Partial demolition of existing wharves and reuse of recovered stone. • Installation of a containment curtain and a floating boom to retain driftwood and suspended particles during wharf demolition or dredging activities required for preparation of the granular foundation. • Excavation of the seabed (contaminated sediments) to allow for the installation of the granular foundation for the new crib structures. • Work required for the installation of the granular foundation of the new timber crib wharves. • Supply of all materials required for the construction of ACC-treated timber crib wharves. • Demolition of the riprap protection on one side of the wharf approach. • Placement of pit run and granular materials for the widening of the wharf approach. • Stockpiling (according to potential contamination) and characterization of dredged materials to construct the granular base for the new crib structures. • Disposal and/or beneficial use of dredged sediments at authorized sites. • Civil works for the installation of electrical and potable water services to the new wharf. • Paving works for the wharf approach. • Supply and installation of electrical distribution, lighting and water system components.
Not stated in the notice: end user
The source reports 3 amendments. CanPursue observed 2 of them with dates.