⌘K
EN
FR
National Research Council Canada (NRC) Contracts & Tenders · CanPursue
Buyers
Federal
National Research Council Canada (NRC)
Also known as: National Research Council Canada (NRC)
Observed
Watch
Open now
0
Opportunities
23
Contracts
0
Observed value
$0
Suppliers
0
Overview
Opportunities
Contracts
Suppliers
Categories
Activity
Engineering Services Design of a Double Ice Tank Door at the St. John’s Facility
Closes, Mar 10, 2025
Oscilloscope
Awarded, Feb 11, 2025
Optical spectrum analyzer
Awarded, Feb 11, 2025
Transmission Electron Microscope Bottom Mount Camera
Awarded, Feb 4, 2025
Oscilloscope
Closes, Jan 29, 2025
Optical spectrum analyzer
Closes, Jan 29, 2025
Optical Frequency Domain Reflectometer
Awarded, Jan 23, 2025
Sputter Coating Physical Vapour Deposition System
Awarded, Jan 15, 2025
Reverberation Chamber and Radio Frequency Shielded Control Room
Closes, Jan 14, 2025
Liquid Chromatography-High Resolution Mass Spectrometry System with Differential Ion Mobility
Awarded, Dec 20, 2024
Thickness Mapping System
Awarded, Dec 19, 2024
Optical Frequency Domain Reflectometer
Closes, Dec 18, 2024
Liquid Chromatography-High Resolution Mass Spectrometry System with Differential Ion Mobility
Closes, Dec 17, 2024
Transmission Electron Microscope Bottom Mount Camera
Closes, Dec 17, 2024
Sputter Coating Physical Vapour Deposition System
Closes, Dec 11, 2024
Active Flight Controls for Variable Stability System Research
Closes, Nov 27, 2024
Thickness Mapping System
Closes, Nov 26, 2024
M-40 Building Modifications for Helium Recapture System
Awarded, Nov 19, 2024
M-40 Building Modifications for Helium Recapture System
Closes, Oct 24, 2024
Optical Frequency Comb System
Awarded, Oct 23, 2024
Optical Frequency Comb System
Closes, Oct 22, 2024
Torque Rheometer System
Awarded, Oct 7, 2024
Melt Flow Indexer
Closes, Oct 2, 2024
Dimensional Metrology Laboratory Air Filter
Awarded, Sep 18, 2024
Dimensional Metrology Laboratory Air Filter
Awarded, Sep 17, 2024
Sputter Coating Physical Vapour Deposition System
Closes, Sep 6, 2024
Dimensional Metrology Laboratory Air Filter
Closes, Aug 29, 2024
High Precision Screen Printer ATMAOE MF44
Awarded, Aug 29, 2024
Melt Flow Indexer
Closes, Aug 16, 2024
Torque Rheometer System
Closes, Aug 16, 2024