This RFP is only available to the following short-listed Proponents: The List of Prequalified Consultants to be invited to participate in this RFP is taken from RFEI 2025-03.
- Klohn Crippen Berger Ltd.
- McElhanney Ltd.
- WSP Canada Inc.
Any submission received from others will be returned without review.
Alberta Transportation and Economic Corridors requests the submission of proposals for
Contract “A”: CON0025426
BF76170, BRIDGE REPLACEMENT
CARRYING HWY. 11:02 OVER TWO O’CLOCK CREEK NEAR NORDEGG, AB
CONSTRUCTION WAC0090429
BF76086, BRIDGE REPLACEMENT
CARRYING HWY. 11:02 OVER TRIBUTARY TO NORTH SASKATCHEWAN RIVER NEAR NORDEGG AB
CONSTRUCTION WAC0094720
BF76168, BRIDGE REPLACEMENT
CARRYING HWY. 11:02 OVER TRIBUTARY TO NORTH SASKATCHEWAN RIVER NEAR NORDEGG AB
CONSTRUCTION WAC0094725
BF 76367, BRIDGE REPLACEMENT
CARRYING HWY. 11:02 OVER TRIBUTARY TO NORTH SASKATCHEWAN R. NEAR NORDEGG AB
CONSTRUCTION WAC0090296
Contract “B”: CON0025734
BF 02050, CULVERT REPLACEMENT
CARRYING HWY. 27:06 OVER UNNAMED TRIBUTARY SUNDRE, AB
CONSTRUCTION WAC0087123
BF 00524, CULVERT REPLACEMENT
CARRYING HWY. 582:02 OVER DEADRICK CREEK NEAR DIDSBURY, AB
CONSTRUCTION WAC0087013
BF 77599, BRIDGE REPLACEMENT
CARRYING HWY. 734:16 OVER ELK CREEK BRIDGE NEAR NORDEGG, AB
CONSTRUCTION WAC0090417
BF 77582, BRIDGE REPLACEMENT
CARRYING HWY. 734:16 OVER ELK CREEK BRIDGE NEAR NORDEGG, AB
CONSTRUCTION WAC0090099
Preliminary Engineering, Detailed Design, Contract Tendering, Contract Administration, Construction and Fabrication Supervision, Post Construction, Warranty Inspection for Culvert and Standard Bridge Replacement and Other Work.
THE PROPOSAL MUST BE SUBMITTED IN TWO SEPARATE FILES: PART ONE (QUALIFICATION SUBMISSION) AND PART TWO (FEE PROPOSAL), PDF DOCUMENTS BOTH LESS THAN 10MB IN SIZE.
No payment will be made by Alberta Transportation and Economic Corridors for costs incurred in the preparation or submission of this proposal. Selection of the Consultant will be based on the best overall value to Alberta Transportation and Economic Corridors and not necessarily the lowest cost estimate.