Créez un compte gratuit et décrivez votre entreprise. Avec l'essai, CanPursue compare chaque occasion à votre profil et explique la correspondance.
Créer un compte gratuitCréez un compte gratuit pour voir les contrats passés semblables : qui a gagné et à quel prix.
Créer un compte gratuitCurrently SaskPower’s northern and southern grid systems are not connected, and power is “wheeled” through Manitoba in partnership with Manitoba Hydro. SaskPower is exploring new transmission lines to connect its northern and southern transmission systems to improve the supply of reliable and safe power to the far north to meet forecast demand in the northern region. This is a complex project, and SaskPower is committed to meaningful and transparent engagement with Indigenous communities and the public. SaskPower is considering two parallel approximately 250-kilometre transmission lines to connect the northern and southern systems. In addition to the two new lines, the project is expected to include the construction of a new eight position 230 kV switching station south of E.B. Campbell switching station with the northern terminal point tying into existing E.B. Campbell switching station. The proposed transmission lines would start near the E.B. Campbell Switching Station and connect to the northern grid at the Island Falls Switching Station. To do this, SaskPower would need to build the lines through western portions of the Saskatchewan River Delta and through the boreal plain and shield ecosites with limited or no road access. (all work collectively called the “Project”, the “North South Transmission System Interconnection Project”).
Non précisé dans l'avis : méthode d'approvisionnement, critères de sélection, catégorie, région de livraison, région de l'appel d'offres, période prévue du contrat, utilisateur final
Aucune modification observée.
Aucune pièce jointe dans les données ouvertes.
Aucune personne-ressource dans les données ouvertes.