Créer un compte gratuitTender available date: Tuesday, November 10, 2026. Tender closing date: Tuesday, December 8, 2026.
Project Inquiries: Ikhtiyar Mammadov, Manager, Engineering Services Procurement, Alberta Transportation and Economic Corridors. E-mail: Ikhtiyar.Mammadov@gov.ab.ca.
TENDERS will only be received by email at trans.tender@gov.ab.ca, before 2:01:00 p.m. Alberta Time (ABT), for construction of the following work:
TND0025300
Minor Grading, Cold Milling, Asphalt Concrete Pavement (ACP) and Other Work 2:26 N. of Hwy. 11A to N. of Hwy. 53 kilometre 3.400 to 45.196 (NBL) 12:08 W. of Hwy. 2 to E. of Hwy. 2 kilometre 20.170 to 21.350
CENTRAL REGION
128,900 Tonne Supply of Aggregate - With Option 1.30 Kilometre Sideslope Improvement 1,700 Metre Drainage Improvements 122 Cubic Metre Grouting of Abandoned Culverts 55 Metre Smooth Wall Steel Pipe - Supply and Install (750 mm dia.) 75 Metre Smooth Wall Steel Pipe - Supply and Install (900 mm dia.) 60 Metre Smooth Wall Steel Pipe - Supply and Install (1,200 mm dia.) 37,900 Square Metre Cold Milling Asphalt Pavement - 40 mm 109,760 Square Metre Cold Milling Asphalt Pavement - 50 mm 164,450 Square Metre Cold Milling Asphalt Pavement - 60 mm 16,800 Square Metre Cold Milling Asphalt Pavement - 70 mm 47,600 Square Metre Cold Milling Asphalt Pavement - 80 mm 59,700 Square Metre Cold Milling Asphalt Pavement - 100 mm 128,900 Tonne Asphalt Concrete Pavement - Superpave - Mix Type 100-F-12.5 (PG 64-28) 41.95 Kilometre Roadway Lines - Supplying Paint and Painting (Lane Dividing and 2 Edge Lines) 51 Message Durable Pavement Message - Gore Area 73.76 Kilometre Milled Rumble Strip - Shoulder 1,750 Metre High Tension Cable Barrier (TL-3, design dynamic deflection 2.45 m) - Supply and Install 19 Location HTCB Isolation Break 1 Lump Sum Demolition and Disposal of Bridge Structure (B.F. 75644 ZN-2)
Contractor to supply all materials.
Contract Completion Date: September 15, 2027.
Non précisé dans l'avis : critères de sélection, région de livraison, région de l'appel d'offres, période prévue du contrat, utilisateur final
Aucune modification observée.
Aucune pièce jointe dans les données ouvertes.
Aucune personne-ressource dans les données ouvertes.