CanPursue

Recherche

  • Recherche
  • Occasions
  • Acheteurs
  • Fournisseurs
  • Contrats
  • Attributions

Intelligence

  • AperçuCompte requis
  • Listes de suiviCompte requis
  • PipelineCompte requis
  • IntelligenceCompte requis
Créer un compte gratuit

Connexion

⌘K
ENFR
Queen Elizabeth Provincial Park 2 - Water Line Replacement | Alberta Forestry and Parks · CanPursue
Occasions
La correspondance fait partie de l'essai et des forfaits payants.Ferme dans 10 joursRFQ

Queen Elizabeth Provincial Park 2 - Water Line Replacement

Alberta Forestry and Parks27PAR656Alberta
Ouvrir la source officielleAjouter au pipeline
Publiée
6 nov. 2026
Répondre d'ici le
30 nov. 2026Ferme dans 10 jours
Dernière modification
Aucune

Voyez comment cette occasion correspond à votre entreprise

Créez un compte gratuit et décrivez votre entreprise. Avec l'essai, CanPursue compare chaque occasion à votre profil et explique la correspondance.

Créer un compte gratuit

Qui a remporté des contrats semblables

Créez un compte gratuit pour voir les contrats passés semblables : qui a gagné et à quel prix.

Créer un compte gratuit

Description

PROJECT BACKGROUND: The distribution water line connecting pump house to the staff house and shop has suffered continuous failures due to its age.

PROJECT OBJECTIVE: Replace existing distribution water line to new 50mm HDPE from existing main CC valve at pump house to the existing CC valve at the shop by means of directional drilling. Replace existing distribution water line to new 50mm HDPE from existing main CC valve at pump house to the replaced CC valve at the staff house.

SCOPE OF WORK: Contractor is responsible for all necessary equipment, tradesmen, and supplies for the completion of the following scope of work:

1. Any required line locates are the responsibility of the Contractor. 2. Remove steel barrier posts in front of pump house and set aside for reinstalment. 3. Remove front concrete step at pump house and set aside for reinstalment. 4. Partially excavate down to main CC valve, using a step downside method of embankment then expose CC valve along with both existing water line connections by means of hydro-vac. This procedure to be used on all three CC valves. 5. Directional drill new 50mm HDPE water line with 12-gauge wire tracer wire from pump house to existing CC valve in front of the shop. a. All existing fittings and connections will be replaced on existing CC valves. 6. Directional drill new 50mm HDPE water line with 12-gauge tracer wire from pump house to replaced CC valve on east side of the staff house. 7. All existing fittings and connections will be replaced on existing water line from staff house to the replaced CC valve. 8. Pressure test to be completed to the closed existing and replaced CC valves (x3) for a min of 15 minutes, repeated again to the opened CC valves (x2 shop and house) for min of 15 minutes. 9. Once pressure test is confirmed all excavations to be brought up over grade for settlement. 10. Reinstall Barrier posts level, with a minimum of 4’ above ground, similar height prior to removal. 11. Reinstall concrete apron with 97% compaction to the grade material – material to be provided by Alberta Forestry and Parks. 12. Existing water lines except for staff house CC valve will not be removed and all line locates to be completed by Alberta Parks with site map included with RFQ.

Refer to the RFQ document for additional information.

Approvisionnement

Type d'approvisionnement
RFQ
Méthode d'approvisionnement
Competitive
Catégorie
Services
Juridiction
Alberta

Non précisé dans l'avis : critères de sélection, région de livraison, région de l'appel d'offres, période prévue du contrat, utilisateur final

Exigences et qualifications

Arrangement en matière d'approvisionnement
Non précisé dans l'avis public
Exigence de sécurité
Non précisé dans l'avis public
Accords commerciaux
—
Motif de l'appel d'offres limité
—

Classification

NIBS
—
UNSPSC
  • 72150000
  • 72154400

Modifications

Aucune modification observée.

Documents

Aucune pièce jointe dans les données ouvertes.

Personne-ressource

Aucune personne-ressource dans les données ouvertes.

Liés

Autres occasions de cet acheteur

  • FireSmart Arborist Activities - Elkwater (Cypress Hills Provincial Park)20 nov.
  • Haig Lake Fire Base Washhouse Conversion and Interior Renovation23 nov.
  • FireSmart Mulching Activities - Elkwater (Cypress Hills Provincial Park)23 nov.
  • Process Engineering (Oil and Gas) Wildfire Investigation SME27 nov.
  • Residence Cistern Replacement - Lesser Slave Lake Provincial Park – Boreal Centre Site27 nov.

Contrats liés

Aucun dossier lié observé.

Source

Ouvrir la source officielle

Vérifiez l'avis et téléchargez l'appel d'offres complet sur la page officielle.

Source
APC
Appel d'offres
27PAR656
Numéro de référence
AB-2026-07396
Observé
19 nov. 2026

Ne manquez aucune modification

Suivez cette occasion dans votre pipeline et vos listes de suivi avec un compte gratuit.

Créer un compte gratuit