Créez un compte gratuit et décrivez votre entreprise. Avec l'essai, CanPursue compare chaque occasion à votre profil et explique la correspondance.
Créer un compte gratuitCréez un compte gratuit pour voir les contrats passés semblables : qui a gagné et à quel prix.
Créer un compte gratuitThe Watermain Extension Program was created to improve the existing water system for better connectivity and looping. This program provides the following benefits: • Improve fire flow for existing areas • Reduce/mitigate water quality concerns • Improve the system design to meet current design standard • Establish better water network for future redevelopment, and operational considerations This program identified two watermain upgrades that includes the crossing of Canadian Pacific Kansas City (CPKC) track/RoW (Righ-of-Way). The upgrade projects are on 15 St SE between 9 Av SE & 20 Av SE (hereafter referred to 15st). This project also includes a water main upgrade and storm drainage upgrade on 19 Av SE. The second project is a water main upgrade on 26 Av SE at Dartmouth Rd/Highfield Rd SE (hereafter referred to Dartmouth Rd). For both projects, due to the geotechnical conditions, the crossings of the CPKC RoW will be completed using Horizontal Hammer Boring of a 750mm diameter steel casing with the installation of the carrier pipe within the installed casing. All other work on the projects will be with open cut construction.
Non précisé dans l'avis : critères de sélection, région de livraison, région de l'appel d'offres, période prévue du contrat, utilisateur final
Aucune modification observée.
Aucune pièce jointe dans les données ouvertes.
Aucune personne-ressource dans les données ouvertes.