Créer un compte gratuitTender available date: Wednesday, October 28, 2026. Tender closing date: Wednesday, November 25, 2026.
Project Inquiries: Jennifer Johnstone, Project Procurement Officer, Alberta Transportation and Economic Corridors. E-mail: Jennifer.Johnstone@gov.ab.ca.
TENDERS will only be received by email at trans.tender@gov.ab.ca, before 2:01:00 P.M., for construction of the following work:
TND0026312
Riprap Improvements Keho, Chain Lakes and Pine Coulee Reservoirs Location 1: Keho Reservoir Main Dam – Located 15 km northwest of Nobleford, AB Location 2: Chain Lakes Reservoir – Located 50 km west of Stavely, AB Location 3: Pine Coulee Low Level Outlet Stilling Basin 14 km west of Stavely, AB
APPROXIMATE QUANTITIES: KEHO RESERVOIR 1 Lump Sum Keho Reservoir Care of Water 350 Cubic Metre Topsoil and Subsoil Stripping 3,000 Cubic Metre Common Excavation 3,000 Cubic Metre Waste Material Hauling and Disposal 350 Tonne Supply and Install Road Gravel Zone 4B 500 Tonne Keho Reservoir Supply and Install Bedding Gravel Zone 5B 675 Tonne Supply and Install Riprap Zone 6A 5,200 Tonne Supply and Install Riprap Zone 6D 1 Lump Sum North Jetty Repair 350 Cubic Metre Topsoil and Subsoil Placement 2,000 Square Metre Keho Reservoir Grass Seeding CHAIN LAKES 1 Lump Sum Debris and Organic Material Removal 600 Tonne Chain Lakes Supply and Install Riprap Zone 6B 1 Lump Sum Regrading of Existing Riprap 1,000 Square Metre Chain Lakes Grass Seeding PINE LAKES 350 Tonne Supply and Install Road Gravel Zone 4B 225 Tonne Pine Coulee Supply and Install Bedding Gravel Zone 5B 20 Tonne Install Salvaged Riprap Zone 6A 500 Tonne Pine Coulee Supply and Install Riprap Zone 6B 1000 Square Metre Pine Coulee Grass Seeding
Contractor to supply all materials. Contract Completion Dates: • Substantial Performance of the Work – March 31, 2027 • Total Performance of the Work – May 31, 2027
Non précisé dans l'avis : critères de sélection, région de livraison, région de l'appel d'offres, période prévue du contrat, utilisateur final
Aucune modification observée.
Aucune pièce jointe dans les données ouvertes.
Aucune personne-ressource dans les données ouvertes.