Créez un compte gratuit et décrivez votre entreprise. Avec l'essai, CanPursue compare chaque occasion à votre profil et explique la correspondance.
Créer un compte gratuitCréez un compte gratuit pour voir les contrats passés semblables : qui a gagné et à quel prix.
Créer un compte gratuitThis RFP is only available to the following short-listed Proponents: The List of Prequalified Consultants to be invited to participate in this RFP is taken from 2026-05.
.1 GeoMetrix Group Engineering Ltd. .2 Parsons Inc. .3 Stantec Consulting Ltd.
Any submission received from others will be returned without review.
BF75539-1 Major Bridge Design Carrying HWY 58:08, Over Ponton River Construction WAC0095413
BF73442-1 Major Bridge Design Carrying HWY 35:14, Over MELITO CREEK, Construction WAC0095418
BF73426-1 Major Bridge Design Carrying HWY 35:10, Over Kemp River Construction WAC0095423
BF76669-1 Major Bridge Design Carrying HWY 40:34, Over Railway CNR Construction WAC0095428
Preliminary Engineering, Detailed Design, Contract Tendering, Construction Supervision / Contract Administration, Post Construction and Warranty Inspection.
THE PROPOSAL MUST BE SUBMITTED IN TWO SEPARATE FILES; PART ONE (TECHNICAL QUALIFICATIONS) AND PART TWO (PROPOSAL FEE) (PDF DOCUMENTS EACH LESS THAN 10MB IN SIZE.
This is a Request for Proposal and not an Invitation to Tender. Alberta Transportation and Economic Corridors reserves the right to:
a) Request clarification from the Contractor on a proposal at any time during the evaluation process. b) Accept a proposal without negotiation. c) Reject a proposal without negotiation. d) Negotiate changes in the Technical or Financial content of the successful proposal.
Non précisé dans l'avis : critères de sélection, région de livraison, région de l'appel d'offres, période prévue du contrat, utilisateur final
Aucune modification observée.
Aucune pièce jointe dans les données ouvertes.
Aucune personne-ressource dans les données ouvertes.