CanPursue

Recherche

  • Recherche
  • Occasions
  • Acheteurs
  • Fournisseurs
  • Contrats
  • Attributions

Intelligence

  • AperçuCompte requis
  • Listes de suiviCompte requis
  • PipelineCompte requis
  • IntelligenceCompte requis
Créer un compte gratuit

Connexion

⌘K
ENFR
EDTI EMS Training and Operational Workflow Development | Epcor · CanPursue
Occasions
La correspondance fait partie de l'essai et des forfaits payants.FerméRFP

EDTI EMS Training and Operational Workflow Development

Epcor203680Alberta
Ouvrir la source officielleAjouter au pipeline
Publiée
14 oct. 2026
Répondre d'ici le
21 oct. 2026
Dernière modification
Aucune

Voyez comment cette occasion correspond à votre entreprise

Créez un compte gratuit et décrivez votre entreprise. Avec l'essai, CanPursue compare chaque occasion à votre profil et explique la correspondance.

Créer un compte gratuit

Qui a remporté des contrats semblables

Créez un compte gratuit pour voir les contrats passés semblables : qui a gagné et à quel prix.

Créer un compte gratuit

Description

The intent of this RFP is to find a Successful Proponent capable of providing the Work described immediately below. A more detailed description of the Work can be found in Appendix 1 (Information).

EPCOR is implementing a dedicated Energy Management System (EMS) in parallel with the Schneider Electric Advanced Distribution Management System (ADMS) v3.11 upgrade. The EMS will provide enhanced transmission system monitoring, control, reliability analysis, and decision-support capabilities, representing a significant evolution from the current operating model where transmission functions are managed within the ADMS environment.

To support this transition, EPCOR is seeking an experienced and Succesful Proponent to develop a comprehensive transmission-specific operator training program that equips System Control Operators with the knowledge, skills, and competencies necessary to safely and effectively utilize the new EMS while meeting Alberta Reliability Standards training and qualification requirements.

The project will develop two integrated training deliverables along with the associated operational workflows and procedures. The first deliverable will establish a foundational EMS training program covering core system functionality, real-time monitoring and control, switching, alarm management, network visualization, operating procedures, and competency assessments required for initial operator qualification. The second deliverable will focus on advanced EMS applications, including contingency analysis, state estimation, load forecasting, reliability assessment tools, and other analytical functions that support operational decision-making. Additionally, Deliverable 2 will include the development of all EMS specific operational workflows, procedures, and supporting documentation required for the effective use of EMS functionality within EPCOR's System Control Centre. Together, these deliverables will create a sustainable training and operational framework that supports system implementation, operator readiness, regulatory compliance, and the safe and reliable operation of EPCOR's transmission system.

EPCOR's transmission system is relatively small compared to those of other Transmission Facility Owners (TFOs). The network consists of 36 substations and a limited amount of 500 kV, 240 kV, and 72 kV transmission infrastructure, including both overhead lines and oil-filled pipe-type cables. City of Edmonton's peak load is approximately 1,300-1,400 MW, representing just over 8% of Alberta's internal electricity demand. Unlike some jurisdictions, EPCOR is not a balancing authority and is not responsible for generation dispatch or system balancing functions. As a result, the scope and complexity of the EMS project are considerably smaller than those associated with the distribution system.

The EMS platform will not be fully operational during the development of this training program. However, there will be access to a playpen. The Successful Proponent must demonstrate the ability to develop operator training materials, competency assessments, and operational workflows based on Schneider Electric EMS design documentation, functional specifications, system requirements, use cases, playpen access, and existing implementation experience.

EPCOR makes no representations or warranties regarding the accuracy or completeness of the information contained in this RFP. The Proponent is responsible for making its own evaluation of information and data contained in this RFP and in preparing and submitting its Reply.

Approvisionnement

Type d'approvisionnement
RFP
Méthode d'approvisionnement
Competitive
Catégorie
Services
Juridiction
Alberta

Non précisé dans l'avis : critères de sélection, région de livraison, région de l'appel d'offres, période prévue du contrat, utilisateur final

Exigences et qualifications

Arrangement en matière d'approvisionnement
Non précisé dans l'avis public
Exigence de sécurité
Non précisé dans l'avis public
Accords commerciaux
—
Motif de l'appel d'offres limité
—

Classification

NIBS
—
UNSPSC
  • 81000000
  • 81100000
  • 81101516
  • 86000000
  • 86101800

Modifications

Aucune modification observée.

Documents

Aucune pièce jointe dans les données ouvertes.

Personne-ressource

Aucune personne-ressource dans les données ouvertes.

Liés

Autres occasions de cet acheteur

  • Regulatory AI Tool 13 nov.
  • South Edmonton Area Load Reliability – Distribution and Transmission Study3 déc.
  • Distribution Aerial & Underground Trades4 déc.
  • 203591 - RFP-EWSI-9K-AB-ED- MSA Mechanical Services4 déc.
  • Distribution Transformers16 déc.

Contrats liés

Aucun dossier lié observé.

Source

Ouvrir la source officielle

Vérifiez l'avis et téléchargez l'appel d'offres complet sur la page officielle.

Source
APC
Appel d'offres
203680
Numéro de référence
AB-2026-06848
Observé
21 oct. 2026

Ne manquez aucune modification

Suivez cette occasion dans votre pipeline et vos listes de suivi avec un compte gratuit.

Créer un compte gratuit