CanPursue

Recherche

  • Recherche
  • Occasions
  • Acheteurs
  • Fournisseurs
  • Contrats
  • Attributions

Intelligence

  • AperçuCompte requis
  • Listes de suiviCompte requis
  • PipelineCompte requis
  • IntelligenceCompte requis
Créer un compte gratuit

Connexion

⌘K
ENFR
Irrigation Repair and Replacement | Alberta Agriculture and Irrigation · CanPursue
Occasions
La correspondance fait partie de l'essai et des forfaits payants.FerméRFP

Irrigation Repair and Replacement

Alberta Agriculture and Irrigation27AGI085Alberta
Ouvrir la source officielleAjouter au pipeline
Publiée
2 oct. 2026
Répondre d'ici le
6 nov. 2026
Dernière modification
Aucune

Voyez comment cette occasion correspond à votre entreprise

Créez un compte gratuit et décrivez votre entreprise. Avec l'essai, CanPursue compare chaque occasion à votre profil et explique la correspondance.

Créer un compte gratuit

Qui a remporté des contrats semblables

Créez un compte gratuit pour voir les contrats passés semblables : qui a gagné et à quel prix.

Créer un compte gratuit

Description

Project Background: To maximize the irrigation potential of the land in the Brooks and Bow Island areas, we need to reorganize the placement of the linear pivots as well as demo old and repair irrigation line. Relocating the two linear pivots to the Brooks area would significantly increase the irrigated acreage, effectively doubling the irrigation capacity across the three locations. Access to irrigated land for agricultural research in Southern Alberta has been a high priority for researchers working with the County of Newell. Moving the linear pivots from the Bow Island property will also provide an opportunity to optimize the irrigation layout at that location. Improving the irrigation efficiency at all farm sites will make the land more attractive to lease and provide leaseholders with greater flexibility to irrigate as needed.

Project Objectives: The project will be broken down into 2 distinct phases. We would like to have a single contractor responsible for managing all aspects of this project.

Phase one of this project will include separating and moving two, seven tower linear pivots from SE 17-9-11-W4 (County of Forty Mile) to three separate field locations in the County of Newell near Brooks, AB. The two linear pivots will need to be separated and re-setup in 6 different fields with 5 fields requiring 2 towers and 1 field requiring a 3-tower set up. Once set up, each new installation will require a generator to operate it, a new panel, and a guidance system to direct it. The successful proposal will ensure to the best of their abilities which system set up will best match each field.

Once the site at SE 17-9-11-W4 is cleared of the linear pivot spans, the second phase will be to remove the existing mainline and electric service (approximately 700 m), remove and install a new mainline (approximately 350 m), new power from the pumphouse to the new pivot pad (approximately 350 m), new electrical panels and VFD, and new low pressure centre pivot. The design of the pivot and sprinkler package should be for no less than 1000 GPM. The centre pivot will be required to have GPS guidance and be set up to be operated remotely. It is anticipated that this will be a turnkey operation that maximizes the acres that the LPCP can cover.

All work to be completed after harvest (2026) and before seeding (2027).

Project Structure/Business Model: This project needs to be managed and maintained by the contractor awarded the bid. Changes and updates need to be communicated to the Contracting Manager and the CDC Project Coordinator. The project may need to have phase 1 and phase 2 happening concurrently. The winning proposal should outline clearly how they will ensure the timely completion of this project so that all areas will be able to be irrigated at the starting of the field season in 2027.

Key Stakeholders: The key stakeholders of this project are listed below: • Contractor • County of Newell • County of Forty Mile • Ministry of Infrastructure • Eastern Irrigation District • St. Mary’s Irrigation District • GOA on-site staff • Field Lease Holders

Related Project Documents: All documents will be available upon request during the suggested walk through to all interested parties creating a proposal to this RFP. We have access to original drawings for all sites as available.

Miscellaneous: Walk through of the removal of the linear pivots at SE 17-9-11-W4 will be available between 9 am and 2 pm on October 13, 2026. Please create the site visit time by contacting the Contracting Manager before October 12th, 2026.

Approvisionnement

Type d'approvisionnement
RFP
Méthode d'approvisionnement
Competitive
Catégorie
Services
Juridiction
Alberta

Non précisé dans l'avis : critères de sélection, région de livraison, région de l'appel d'offres, période prévue du contrat, utilisateur final

Exigences et qualifications

Arrangement en matière d'approvisionnement
Non précisé dans l'avis public
Exigence de sécurité
Non précisé dans l'avis public
Accords commerciaux
—
Motif de l'appel d'offres limité
—

Classification

NIBS
—
UNSPSC
  • 21000000
  • 21100000
  • 21102500
  • 39120000
  • 70000000
  • 70171700
  • +5 de plus

Modifications

Aucune modification observée.

Documents

Aucune pièce jointe dans les données ouvertes.

Personne-ressource

Aucune personne-ressource dans les données ouvertes.

Liés

Autres occasions de cet acheteur

  • Laboratory Particle Size Analyzer13 nov.
  • Oldman River Dam - Evaluation of Data Anomalies Between Regular Slope Inclinometers and ORICA (Measurand) SAA Monitoring Systems16 nov.
  • Carolside Dam – Underwater Inspection and Condition Assessment of the Low-Level Outlet Conduit16 nov.
  • Consultant Services for Program Area Infrastructure and Capital Equipment Condition Assessment16 nov.
  • Steam Jacketed Kettle Mixer17 nov.

Contrats liés

Aucun dossier lié observé.

Source

Ouvrir la source officielle

Vérifiez l'avis et téléchargez l'appel d'offres complet sur la page officielle.

Source
APC
Appel d'offres
27AGI085
Numéro de référence
AB-2026-06638
Observé
6 nov. 2026

Ne manquez aucune modification

Suivez cette occasion dans votre pipeline et vos listes de suivi avec un compte gratuit.

Créer un compte gratuit