For Blantyre Park Outdoor Pool Improvements 1. Part A - Mobilization, Demolition, Removals & General Site Clean-Up i. Mobilization, demobilization, coordination of sub-trades, bonding, site security, temporary fences and tree protection fencing & facilities, utility locates, sediment control, dust control, staging, traffic control, signs and other costs required for compliance with General and Supplementary Requirements and Division 1. ii. Stripping, removal and disposal of existing topsoil, lawns and sand, as indicated on drawings and in specifications, including haulage and disposal. iii. Demolition, removal and disposal or relocation as indicated for various items including playground equipment, benches, chain link fencing, concrete pads, asphalt pavement, and any other site furnishing noted on drawings, inclusive of any footings. 2. Part B - Site Work & Restoration i. Subsection 1 - Earthworks, Drainage, Finish Surfacing, and Restoration i. Grading and earthworks, including bulk excavation, rough grading, backfilling and fine grading. ii. Supply & install new sub-drainage works. iii. Supply and install new concrete pavement with integral colouring for new splash pad deck and concrete pavement (natural-grey colour) for all other paved areas, incl. pads for new benches, picnic tables and bike racks. iv. Supply and install new concrete playground edges and raised curb/planter walls. v. Supply and install new concrete sidewalks and barrier curbs, including depressed curbs with tactile walking surface indicator pavers. vi. Supply and install new medium-duty asphalt pavement and base for new park pathways. vii. Supply and install new light-duty asphalt pavement for new pickleball court, including new net/post assembly and court line painting. viii. Supply and install new armour stone retaining/seat-wall. ix. Supply and install new rubber playground safety surfacing with EPDM wearing course including new granular base and interfaces with other surfaces. x. Supply and install engineered cedar wood fibre playground safety surface inclusive of filter fabric and drainage layer (for new adult fitness area). xi. Supply and install new playground equipment as specified, including third-party testing. xii. Supply and install new adult fitness equipment, including third-party testing. xiii. Supply and install new splash pad including all spray features, activator bollards, granite boulders, piping, drains, manifold, controller, rainwater diverter system, above-ground cabinet, incl. all servicing upgrades and connections (refer to Civil and Electrical) and testing. ii. Subsection 2 - Site Furnishings and Planting i. Supply and install new accessible picnic tables. ii. Supply and install new accessible park benches (backed and backless). iii. Supply and install new permanent shade umbrellas and umbrella tables. iv. Supply and install new Adirondack chairs. v. Supply and install new bike racks. vi. Supply and install new water bottle filler, incl. water supply and sanitary drain connections. vii. Supply and install new chain link fencing. viii. Supply and install new precast ping pong table. ix. Supply and install new 80mm cal. deciduous shade trees. x. Supply and install new multi-stem shrubs, perennials and grasses. xi. Supply and install sod over 150 mm depth new topsoil over all disturbed lawn areas. xii. Supply and install new double-shredded mulch. | Contrat gouvernemental · CanPursue
For Blantyre Park Outdoor Pool Improvements 1. Part A - Mobilization, Demolition, Removals & General Site Clean-Up i. Mobilization, demobilization, coordination of sub-trades, bonding, site security, temporary fences and tree protection fencing & facilities, utility locates, sediment control, dust control, staging, traffic control, signs and other costs required for compliance with General and Supplementary Requirements and Division 1. ii. Stripping, removal and disposal of existing topsoil, lawns and sand, as indicated on drawings and in specifications, including haulage and disposal. iii. Demolition, removal and disposal or relocation as indicated for various items including playground equipment, benches, chain link fencing, concrete pads, asphalt pavement, and any other site furnishing noted on drawings, inclusive of any footings. 2. Part B - Site Work & Restoration i. Subsection 1 - Earthworks, Drainage, Finish Surfacing, and Restoration i. Grading and earthworks, including bulk excavation, rough grading, backfilling and fine grading. ii. Supply & install new sub-drainage works. iii. Supply and install new concrete pavement with integral colouring for new splash pad deck and concrete pavement (natural-grey colour) for all other paved areas, incl. pads for new benches, picnic tables and bike racks. iv. Supply and install new concrete playground edges and raised curb/planter walls. v. Supply and install new concrete sidewalks and barrier curbs, including depressed curbs with tactile walking surface indicator pavers. vi. Supply and install new medium-duty asphalt pavement and base for new park pathways. vii. Supply and install new light-duty asphalt pavement for new pickleball court, including new net/post assembly and court line painting. viii. Supply and install new armour stone retaining/seat-wall. ix. Supply and install new rubber playground safety surfacing with EPDM wearing course including new granular base and interfaces with other surfaces. x. Supply and install engineered cedar wood fibre playground safety surface inclusive of filter fabric and drainage layer (for new adult fitness area). xi. Supply and install new playground equipment as specified, including third-party testing. xii. Supply and install new adult fitness equipment, including third-party testing. xiii. Supply and install new splash pad including all spray features, activator bollards, granite boulders, piping, drains, manifold, controller, rainwater diverter system, above-ground cabinet, incl. all servicing upgrades and connections (refer to Civil and Electrical) and testing. ii. Subsection 2 - Site Furnishings and Planting i. Supply and install new accessible picnic tables. ii. Supply and install new accessible park benches (backed and backless). iii. Supply and install new permanent shade umbrellas and umbrella tables. iv. Supply and install new Adirondack chairs. v. Supply and install new bike racks. vi. Supply and install new water bottle filler, incl. water supply and sanitary drain connections. vii. Supply and install new chain link fencing. viii. Supply and install new precast ping pong table. ix. Supply and install new 80mm cal. deciduous shade trees. x. Supply and install new multi-stem shrubs, perennials and grasses. xi. Supply and install sod over 150 mm depth new topsoil over all disturbed lawn areas. xii. Supply and install new double-shredded mulch.