The major works forming this RFT are the following: • Install new temporary plant entrance from Beechgrove Drive and granular site access/haulage road routed along the northern boundary of Highland Creek Treatment Plant within Toronto Regional Conservation Authority (TRCA) and City of Toronto Urban Forestry Regulated lands, • Bulk excavation and removal of approximately 45,000 m3 of stockpile materials. Please refer to the RFT documents in the Ariba event for full requirements and submission details. | Contrat gouvernemental · CanPursue
The major works forming this RFT are the following: • Install new temporary plant entrance from Beechgrove Drive and granular site access/haulage road routed along the northern boundary of Highland Creek Treatment Plant within Toronto Regional Conservation Authority (TRCA) and City of Toronto Urban Forestry Regulated lands, • Bulk excavation and removal of approximately 45,000 m3 of stockpile materials. Please refer to the RFT documents in the Ariba event for full requirements and submission details.