CanPursue

Recherche

  • Recherche
  • Occasions
  • Acheteurs
  • Fournisseurs
  • Contrats
  • Attributions

Intelligence

  • AperçuCompte requis
  • Listes de suiviCompte requis
  • PipelineCompte requis
  • IntelligenceCompte requis
Créer un compte gratuit

Connexion

⌘K
ENFR
This contract includes Work at three (3) Sewage Pumping Stations (SPS) including forcemain works in the City of Toronto, namely, Fallingbrook SPS, Greyabbey SPS, and Humber SPS. There are following Works, in general, to be performed at these SPS: Fallingbrook SPS forcemain: • Approximately 105m of 150mm diameter High Density Polyethylene (HDPE) sanitary forcemain replacement from the sewage pumping station to the existing Maintenance Hole at Fallingbrook Crescent, and • Processing, Structural, Electrical, Mechanical, and Instrumentation Work inside the Pumping Station. Greyabbey SPS forcemain: • Approximately 310m of twin 150mm diameter High Density Polyethylene (HDPE) sanitary forcemain replacement from 150m south of Fordover drive to 100m west of Fintona avenue. • Replacement of the existing discharge Maintenance Hole, and • Processing, Structural, Electrical, Mechanical, and Instrumentation Work inside the Pumping Station. Humber SPS forcemain: • Approximately 223m of twin 150mm diameter High Density Polyethylene (HDPE) sanitary forcemain replacement from the sewage pumping station to the existing Maintenance Hole at Brule Terrace, and • Replacement of the existing discharge Maintenance Hole. Additionally, this contract also includes in general: A pre-construction survey of all properties and CCTV inspection of existing sewers and maintenance holes prior to commencement of the Work, installation of new and/or removal of existing chambers, temporary bypassing of the SPS during the Work, testing and commissioning of the installed forcemains, and Permanent Restoration. | Contrat gouvernemental · CanPursue
Contrats

This contract includes Work at three (3) Sewage Pumping Stations (SPS) including forcemain works in the City of Toronto, namely, Fallingbrook SPS, Greyabbey SPS, and Humber SPS. There are following Works, in general, to be performed at these SPS: Fallingbrook SPS forcemain: • Approximately 105m of 150mm diameter High Density Polyethylene (HDPE) sanitary forcemain replacement from the sewage pumping station to the existing Maintenance Hole at Fallingbrook Crescent, and • Processing, Structural, Electrical, Mechanical, and Instrumentation Work inside the Pumping Station. Greyabbey SPS forcemain: • Approximately 310m of twin 150mm diameter High Density Polyethylene (HDPE) sanitary forcemain replacement from 150m south of Fordover drive to 100m west of Fintona avenue. • Replacement of the existing discharge Maintenance Hole, and • Processing, Structural, Electrical, Mechanical, and Instrumentation Work inside the Pumping Station. Humber SPS forcemain: • Approximately 223m of twin 150mm diameter High Density Polyethylene (HDPE) sanitary forcemain replacement from the sewage pumping station to the existing Maintenance Hole at Brule Terrace, and • Replacement of the existing discharge Maintenance Hole. Additionally, this contract also includes in general: A pre-construction survey of all properties and CCTV inspection of existing sewers and maintenance holes prior to commencement of the Work, installation of new and/or removal of existing chambers, temporary bypassing of the SPS during the Work, testing and commissioning of the installed forcemains, and Permanent Restoration.

City of TorontoDrainstar Contracting Ltd5006610301
Ouvrir la source officielleSuivre
Valeur totale du contrat
Non déclarée
Valeur initiale attribuée
Aucun dossier d'attribution originale dans la source
Début
23 juill. 2025
Fin
—

Chronologie

Officiel
  • Attribué23 juill. 2025
Numéro de contrat
5006610301
Attribué
23 juill. 2025
Instrument
—
Statut
—
Modifications
0 modifications
Source
City of Toronto (Ouvrir la source officielle)
5006610301
Approvisionnement lié
Aucun approvisionnement lié observé.