This contract includes Work at three (3) Sewage Pumping Stations (SPS) in the City of Toronto, namely, Cumber SPS, Mimico SPS, and New Toronto SPS. There are following Works, in general, to be performed at these SPS: • Cumber SPS: o Approximately 443 m of Twin 600 mm diameter Forcemains installation on Lawrence Avenue East from the SPS to the proposed Discharge Maintenance Hole including new Valve Chamber installation and replacement of the existing Valve Chamber, and o Processing, Structural, Electrical, Mechanical, and Instrumentation Work inside the Pumping Station. • Mimico SPS: Approximately 20 m of Twin 600 mm diameter Forcemains installation including replacement of the existing Valve Chamber, o New Valve Chamber installations on the existing 600 mm diameter Forcemains at Albert Avenue and Cavell Avenue intersection, and o Processing, Structural, Electrical, Mechanical, and Instrumentation Work inside the Pumping Station. New Toronto SPS: o Approximately 22 m of Twin 500 mm diameter Forcemains installation including replacement of existing valves, o New Valve Chamber installation on the existing 500 mm diameter Forcemain at Morrison Street and Eleventh Street, and o Processing, Structural, Electrical, Mechanical, and Instrumentation Work inside the Pumping Station. Additionally, this contract also includes in general: A pre-survey of all properties and CCTV inspection of existing sewers and maintenance holes prior to commencement of the Work, installation of new and/or removal of existing chambers, replacement of valves, abandonment and/or removal of the existing pipes, temporary bypassing of the SPS during the Work, testing and commissioning of the installed forcemains, and Permanent Restoration. Additionally, this contract also includes in general: A pre-survey of all properties and CCTV inspection of existing sewers and maintenance holes prior to commencement of the Work, installation of new and/or removal of existing chambers, replacement of valves, abandonment and/or removal of the existing pipes, temporary bypassing of the SPS during the Work, testing and commissioning of the installed forcemains, and Permanent Restoration. | Contrat gouvernemental · CanPursue
Contrats

This contract includes Work at three (3) Sewage Pumping Stations (SPS) in the City of Toronto, namely, Cumber SPS, Mimico SPS, and New Toronto SPS. There are following Works, in general, to be performed at these SPS: • Cumber SPS: o Approximately 443 m of Twin 600 mm diameter Forcemains installation on Lawrence Avenue East from the SPS to the proposed Discharge Maintenance Hole including new Valve Chamber installation and replacement of the existing Valve Chamber, and o Processing, Structural, Electrical, Mechanical, and Instrumentation Work inside the Pumping Station. • Mimico SPS: Approximately 20 m of Twin 600 mm diameter Forcemains installation including replacement of the existing Valve Chamber, o New Valve Chamber installations on the existing 600 mm diameter Forcemains at Albert Avenue and Cavell Avenue intersection, and o Processing, Structural, Electrical, Mechanical, and Instrumentation Work inside the Pumping Station. New Toronto SPS: o Approximately 22 m of Twin 500 mm diameter Forcemains installation including replacement of existing valves, o New Valve Chamber installation on the existing 500 mm diameter Forcemain at Morrison Street and Eleventh Street, and o Processing, Structural, Electrical, Mechanical, and Instrumentation Work inside the Pumping Station. Additionally, this contract also includes in general: A pre-survey of all properties and CCTV inspection of existing sewers and maintenance holes prior to commencement of the Work, installation of new and/or removal of existing chambers, replacement of valves, abandonment and/or removal of the existing pipes, temporary bypassing of the SPS during the Work, testing and commissioning of the installed forcemains, and Permanent Restoration. Additionally, this contract also includes in general: A pre-survey of all properties and CCTV inspection of existing sewers and maintenance holes prior to commencement of the Work, installation of new and/or removal of existing chambers, replacement of valves, abandonment and/or removal of the existing pipes, temporary bypassing of the SPS during the Work, testing and commissioning of the installed forcemains, and Permanent Restoration.

City of TorontoClearway Construction Inc.3797694830
Ouvrir la source officielleSuivre
Valeur totale du contrat
17,5 M $
Valeur initiale attribuée
17,5 M $
Début
21 août 2023
Fin
—

Chronologie

Officiel
  • Attribué21 août 2023. Valeur initiale attribuée: 17,5 M $
Numéro de contrat
3797694830
Attribué
21 août 2023
Instrument
—
Statut
—
Modifications
0 modifications
Source
City of Toronto (Ouvrir la source officielle)
3797694830
Approvisionnement lié
Aucun approvisionnement lié observé.