CanPursue

Recherche

  • Recherche
  • Occasions
  • Acheteurs
  • Fournisseurs
  • Contrats
  • Attributions

Intelligence

  • AperçuCompte requis
  • Listes de suiviCompte requis
  • PipelineCompte requis
  • IntelligenceCompte requis
Créer un compte gratuit

Connexion

⌘K
ENFR
Parks Canada requires the services of a consulting engineering firm to design the replacement structure for Halfway Brook Bridge located on the Cabot Trail in Cape Breton Highlands National Park. Work required under this call-up will include but not limited to, all requirements under the structural Standing Offer Agreement (Required Services 1-4) which includes the initial survey of the existing site, geotechnical investigations, design of the new structure, temporary bypass/diversion, highway approaches and the Coastal Trail parking area redevelopment. | Contrat gouvernemental · CanPursue
Contrats
competitive

Parks Canada requires the services of a consulting engineering firm to design the replacement structure for Halfway Brook Bridge located on the Cabot Trail in Cape Breton Highlands National Park. Work required under this call-up will include but not limited to, all requirements under the structural Standing Offer Agreement (Required Services 1-4) which includes the initial survey of the existing site, geotechnical investigations, design of the new structure, temporary bypass/diversion, highway approaches and the Coastal Trail parking area redevelopment.

Parks CanadaHarbourside Engineering Consultants45446714
Ouvrir la source officielleSuivre
Valeur totale du contrat
1,3 M $
Valeur initiale attribuée
499,8 k $
Début
2 mars 2022
Fin
—

Chronologie

Officiel
  • Attribué2 mars 2022. Valeur initiale attribuée: 499,8 k $
Numéro de contrat
45446714
Attribué
2 mars 2022
Instrument
—
Statut
competitive
Modifications
0 modifications
Source
Federal contracts over $10,000 (Ouvrir la source officielle)
pc
Approvisionnement lié
Aucun approvisionnement lié observé.