- Published
- Nov 17, 2026
- Respond by
- Dec 7, 2026Closes in 17 days
- Latest amendment
- None
Procurement
- Procurement type
- RFP
- Procurement method
- Competitive
- Category
- Services
- Jurisdiction
- Alberta
Not stated in the notice: selection criteria, region of delivery, expected contract period, end user
See how this opportunity fits your company
Create a free account and describe your company. With the trial, CanPursue checks every opportunity against it and explains the fit.
Create free accountDescription
Project Background- Throughout recent fire seasons, there has been an increase in the number of lookout towers impacted by wildfires. In 2024, the High Level Area initiated a project to FireSmart a 100 m radius around its lookout towers to reduce wildfire risk and improve site resilience. This year, we are proposing to complete FireSmart treatments around the Rainbow Lookout Tower. The proposed treatment area is approximately 7.15 hectares.
Project Objectives- The primary objective of this project is to reduce overall surface fuel loading surrounding the Rainbow Lookout Tower in order to decrease potential wildfire intensity, reduce the rate of fire spread, and limit the likelihood of crown fire development. The treatment is designed to modify potential fire behaviour and enhance suppression opportunities within and around the lookout tower site, thereby improving the protection and long-term operability of this critical wildfire detection infrastructure. The proposed treatment area is approximately 7.15 hectares and will focus on reducing fuel loads surrounding the tower through a combination of hand crew operations and mechanical mulching treatments.
The predominant fuel types within the project area have been identified as D2 (Green Aspen) and M2 (Boreal Mixedwood, 50% or less conifer). The successful contractor will also be responsible for constructing access to the lookout tower site. The proposed access route is approximately 10 km in length and will primarily utilize existing linear disturbances. There are two watercourse crossings located along the access route, approximately 500 m and 3 km from the staging area, respectively. The first crossing involves a large permanent stream where an existing bridge is present but currently closed due to stability concerns. The second crossing is a small permanent stream located approximately 3 km from the staging area. Both crossings will require winter construction and must be frozen in accordance with all applicable legislation, regulations, and approval requirements under the Public Lands Act and other relevant provincial legislation. The contractor will be responsible for obtaining all required authorizations and permits, including a Temporary Diversion Licence (TDL) where applicable, and ensuring all crossing construction activities comply with environmental and regulatory requirements.
Related Project Documents – A PDF document will be with the posting of the RFP. It will be a georeferenced map of Rainbow Lookout Tower with the boundary and total area.
Documents
No attachments listed in the open data.
Contact
No contact listed in the open data.
Source
Open official sourceVerify the notice and download the full solicitation on the official page.
- Source
- APC
- Solicitation
- 27TDRHFD806
- Reference number
- AB-2026-07574
- Observed
- Nov 19, 2026