Create free accountTrade Agreement: NAFTA/AIT/Canada-Peru FTA/Canada-Colombia FTA Tendering Procedures: Attachment: YES (PWGSC) Diskette Competitive Procurement Strategy: Lowest/Lower Bid Comprehensive Land Claim Agreement: No Nature of Requirements: Spare Parts W8486-129766/A Mercier, Nicolas Telephone No. - (819) 956-3481 ( ) Fax No. - 819-956-5227 Email: nicolas.mercier@pwgsc.gc.ca
This amendment is raised to extend the Request For Proposal closing date to April 5th, 2013 at 14h00 EDT.
Requirement The Department of National Defence has a requirement for the items detailed below for delivery by March 20, 2013. to Canadian Forces Supply Depots in Montreal (Quebec) and Edmonton (Alberta).
It is the Bidder's responsibility to submit by closing date and time a complete bid.
Technical Evaluation Procedures
Mandatory Technical Evaluation Criteria - Part Number and NSCM/CAGE Bidders must indicate the Part Number and the NSCM/CAGE they are offering.
Mandatory Technical Evaluation Criteria - Substitute Products Bidders proposing a substitute product must meet the following criteria:
In order to be considered for the evaluation of a substitute product, Bidders must provide all required technical information (as detailed in Part 3, Section I, of this RFP) to demonstrate their technical compliance and to confirm form, fit, function, quality and performance of these substitute products.
Mandatory Technical Evaluation Criteria - Replaced Part Numbers from the OEM Bidders proposing a replaced part number must meet the following criteria:
In order to be considered for the acceptance of a replaced part number (superseded or obsolete), Bidders must provide:
a. proof by submitting a copy of a Certificate of Conformity from the Original Equipment Manufacturer (OEM) providing justification/explanation that the part numbers are a replacement of the OEM parts specified herein and are equivalent in form, fit, function, quality and performance to the OEM's parts specified herein; or
b. all required technical information (as detailed in Part 3, Section I, of this RFP) to demonstrate their technical compliance and to confirm form, fit, function, quality and performance of these replaced part numbers.
Item Description
Item 5 GSIN: N4730, NSN: 4730-20-003-9737 Flange Assembly, Reel, Left Quantity: 19, Unit of Issue: Each Part Number: 0377344-1, NSCM: 35907 To be delivered at the CFSD located in Edmonton
Item 6 GSIN: N4730, NSN: 4730-20-003-9737 Flange Assembly, Reel, Left Quantity: 20, Unit of Issue: Each Part Number: 0377344-1, NSCM: 35907 To be delivered at the CFSD located in Montreal
Item 7 GSIN: N4730, NSN: 4730-20-003-9744 Adapter and Flange Assembly Quantity: 19, Unit of Issue: Each Part Number: 0377342-1, NSCM: 35907 To be delivered at the CFSD located in Edmonton
Item 8 GSIN: N4730, NSN: 4730-20-003-9744 Adapter and Flange Assembly Quantity: 20, Unit of Issue: Each Part Number: 0377342-1, NSCM: 35907 To be delivered at the CFSD located in Montreal
Item 11 GSIN: N4710, NSN: 4710-20-003-9794 Hose Assembly, Pump to Reel Quantity: 19, Unit of Issue: Each Part Number: 0377465-1, NSCM: 35907 To be delivered at the CFSD located in Edmonton
Item 12 GSIN: N4710, NSN: 4710-20-003-9794 Hose Assembly, Pump to Reel Quantity: 20, Unit of Issue: Each Part Number: 0377465-1, NSCM: 35907 To be delivered at the CFSD located in Montreal
Item 13 GSIN: N4720, NSN: 4720-20-003-9796 Hose Assembly, Pump Quantity: 19, Unit of Issue: Each Part Number: 0377463-1, NSCM: 35907 To be delivered at the CFSD located in Edmonton
Item 14 GSIN: N4720, NSN: 4720-20-003-9796 Hose Assembly, Pump Quantity: 20, Unit of Issue: Each Part Number: 0377463-1, NSCM: 35907 To be delivered at the CFSD located in Montreal
A copy of the DDL, drawings, and specifications will be automatically forwarded to all suppliers who request the bid solicitation package by the Director Supply Chain Operations, DSCO, Printing Bureau. If suppliers have not received the documents at least ten (10) calendar days prior to bid closing date, suppliers should communicate with the Contracting Authority.
Debriefings After contract award, bidders may request a debriefing on the results of the bid solicitation. Bidders should make the request to the Contracting Authority within fifteen (15) working days of receipt of notification that their bid was unsuccessful The debriefing may be provided in writing, by telephone or in person. Delivery Date: Above-mentioned
The Crown retains the right to negotiate with suppliers on any procurement.
Documents may be submitted in either official language of Canada.
Not stated in the notice: procurement type, procurement method, selection criteria, region of delivery, region of opportunity, expected contract period, end user
The source reports 7 amendments. CanPursue observed 1 of them with dates.