CanPursue

Research

  • Search
  • Opportunities
  • Buyers
  • Suppliers
  • Contracts
  • Awards

Intelligence

  • OverviewAccount required
  • WatchlistsAccount required
  • PipelineAccount required
  • IntelligenceAccount required
Create free account

Sign in

⌘K
ENFR
Queen Elizabeth Provincial Park 2 - Water Line Replacement | Alberta Forestry and Parks · CanPursue
Opportunities
Fit is part of the trial and paid plans.Closes in 10 daysRFQ

Queen Elizabeth Provincial Park 2 - Water Line Replacement

Alberta Forestry and Parks27PAR656Alberta
Open official sourceAdd to pipeline
Published
Nov 6, 2026
Respond by
Nov 30, 2026Closes in 10 days
Latest amendment
None

See how this opportunity fits your company

Create a free account and describe your company. With the trial, CanPursue checks every opportunity against it and explains the fit.

Create free account

Who won similar work

Create a free account to see past contracts like this one: who won and at what price.

Create free account

Description

PROJECT BACKGROUND: The distribution water line connecting pump house to the staff house and shop has suffered continuous failures due to its age.

PROJECT OBJECTIVE: Replace existing distribution water line to new 50mm HDPE from existing main CC valve at pump house to the existing CC valve at the shop by means of directional drilling. Replace existing distribution water line to new 50mm HDPE from existing main CC valve at pump house to the replaced CC valve at the staff house.

SCOPE OF WORK: Contractor is responsible for all necessary equipment, tradesmen, and supplies for the completion of the following scope of work:

1. Any required line locates are the responsibility of the Contractor. 2. Remove steel barrier posts in front of pump house and set aside for reinstalment. 3. Remove front concrete step at pump house and set aside for reinstalment. 4. Partially excavate down to main CC valve, using a step downside method of embankment then expose CC valve along with both existing water line connections by means of hydro-vac. This procedure to be used on all three CC valves. 5. Directional drill new 50mm HDPE water line with 12-gauge wire tracer wire from pump house to existing CC valve in front of the shop. a. All existing fittings and connections will be replaced on existing CC valves. 6. Directional drill new 50mm HDPE water line with 12-gauge tracer wire from pump house to replaced CC valve on east side of the staff house. 7. All existing fittings and connections will be replaced on existing water line from staff house to the replaced CC valve. 8. Pressure test to be completed to the closed existing and replaced CC valves (x3) for a min of 15 minutes, repeated again to the opened CC valves (x2 shop and house) for min of 15 minutes. 9. Once pressure test is confirmed all excavations to be brought up over grade for settlement. 10. Reinstall Barrier posts level, with a minimum of 4’ above ground, similar height prior to removal. 11. Reinstall concrete apron with 97% compaction to the grade material – material to be provided by Alberta Forestry and Parks. 12. Existing water lines except for staff house CC valve will not be removed and all line locates to be completed by Alberta Parks with site map included with RFQ.

Refer to the RFQ document for additional information.

Procurement

Procurement type
RFQ
Procurement method
Competitive
Category
Services
Jurisdiction
Alberta

Not stated in the notice: selection criteria, region of delivery, region of opportunity, expected contract period, end user

Requirements and qualifications

Supply arrangement
Not stated in the public notice
Security requirement
Not stated in the public notice
Trade agreements
—
Limited tendering reason
—

Classification

GSIN
—
UNSPSC
  • 72150000
  • 72154400

Amendments

No amendments observed.

Documents

No attachments listed in the open data.

Contact

No contact listed in the open data.

Related

More from this buyer

  • FireSmart Arborist Activities - Elkwater (Cypress Hills Provincial Park)Nov 20
  • Haig Lake Fire Base Washhouse Conversion and Interior RenovationNov 23
  • FireSmart Mulching Activities - Elkwater (Cypress Hills Provincial Park)Nov 23
  • Process Engineering (Oil and Gas) Wildfire Investigation SMENov 27
  • Residence Cistern Replacement - Lesser Slave Lake Provincial Park – Boreal Centre SiteNov 27

Linked contracts

No related records observed.

Source

Open official source

Verify the notice and download the full solicitation on the official page.

Source
APC
Solicitation
27PAR656
Reference number
AB-2026-07396
Observed
Nov 19, 2026

Never miss an amendment

Track this opportunity in your pipeline and watchlists with a free account.

Create free account