Create free accountTrade Agreement: NAFTA/AIT/Canada FTAs with Peru/Colombia/Panama Tendering Procedures: All interested suppliers may submit a bid Attachment: None Competitive Procurement Strategy: Lowest/Lower Bid Comprehensive Land Claim Agreement: No Nature of Requirements: THIS CANCEL AND SUPERSEDES NOTICE PW-$EDM-607-9831 PUBLISHED ON GETS ON 2013/06/10 AND AMENDED ON 2013/06/20 and 2013/06/28.
1. TITLE: RANGE REMEDIATION - PASSCHENDAELE RANGE, CFB EDMONTON
2. SECURITY: There is no security requirement associated with the requirement.
3. REQUIREMENT: The Department of National Defence has a requirement for the provision of all supervision, material, equipment, labour and transportation required for the remediation (removal and disposal) of lead from Passchendaele Range at CFB Edmonton. The Contractor is required to remove lead from approximately 1250 cubic meters of sand located in the butt assembly of Passchendaele Range at CFB/ASU Edmonton. The Contractor will a perform leachate test in range to determine if the range material is hazardous or non-hazardous prior to commencement of work. Waste characterization (leachable metals) analysis is required.
4. MANDATORY SITE VISIT It is mandatory that the Bidder or a representative of the Bidder visit the work site. Arrangements have been made for site visit to be held on:
DATE: 25-JUNE-2013 TIME: 10:00 AM LOCATION: meet at Building #177
Bidders must communicate with the Contracting Authority no later than 2 pm, 21-June-2013 (Friday), to confirm attendance and provide the names of the person(s) who will attend.
5. EVALUATION AND SELECTION: Mandatory technical evaluation criteria are included in Annex "C" of the solicitation.
A bid must comply with the requirements of the bid solicitation and meet all mandatory technical evaluation criteria to be declared responsive. The responsive bid with the lowest evaluated price will be recommended for award of a contract.
6. PERIOD OF CONTRACT: It is anticipated that the work will take 1-2 weeks to complete.
7. CODE OF CONDUCT CERTIFICATIONS Pursuant to section 01 of Standard Instructions 2003, Bidders who are incorporated, including those bidding as a joint venture, must provide with their bid or promptly thereafter a complete list of names of all individuals who are currently directors of the Bidder. Bidders bidding as sole proprietorship, including those bidding as a joint venture, must provide with their bid or promptly thereafter the name of the owner. Bidders bidding as societies, firms, or partnerships do not need to provide lists of names. If the required names have not been received by the time the evaluation of bids is completed, Canada will inform the Bidder of a time frame within which to provide the information. Failure to comply will render the bid non-responsive. Providing the required names is a mandatory requirement for contract award.
This PWGSC office provides procurement services to the public in English.
CONTRACTING AUTHORITY Lorraine Jenkinson Supply Specialist Public Works and Government Services Canada Acquisitions Branch, Western Region Telus Plaza North 10025 Jasper Avenue, 5th Floor Edmonton, AB T5J 1S6
Telephone: (780) 497-3593 Facsimile: (780) 497-3510 E-mail address: Lorraine.Jenkinson@pwgsc-tpsgc.gc.ca
Delivery Date: Above-mentioned
The Crown retains the right to negotiate with suppliers on any procurement.
Documents may be submitted in either official language of Canada.
Not stated in the notice: procurement type, procurement method, selection criteria, region of delivery, region of opportunity, expected contract period, end user
The source reports 2 amendments. CanPursue observed 1 of them with dates.
No attachments listed in the open data.