CanPursue

Research

  • Search
  • Opportunities
  • Buyers
  • Suppliers
  • Contracts
  • Awards

Intelligence

  • OverviewAccount required
  • WatchlistsAccount required
  • PipelineAccount required
  • IntelligenceAccount required
Create free account

Sign in

⌘K
ENFR
26-1648 Track Package | City of Calgary · CanPursue
Opportunities
Fit is part of the trial and paid plans.Closes in 14 daysRFP

26-1648 Track Package

City of Calgary26-1648Alberta
Open official sourceAdd to pipeline
Published
Jul 27, 2026
Respond by
Nov 26, 2026Closes in 14 days
Latest amendment
None

See how this opportunity fits your company

Create a free account and describe your company. With the trial, CanPursue checks every opportunity against it and explains the fit.

Create free account

Who won similar work

Create a free account to see past contracts like this one: who won and at what price.

Create free account

Description

Overview of the Project The Track Package includes Scope A which is the Main Line Track from Ramsay Inglewood Station in the north to the end of the project limits, as well as Scope B the Maintenance Storage Facility (MSF) track. Scope C includes both scopes. For scope delineation, this RFP is divided as follows: • Scope A: Main Line Track • Scope B: Maintenance & Storage Facility (“MSF”) Track • Scope C: Combined Track Package (Scopes A and B) in its entirety. Scope A Main Line Track Ballasted Track: from the Top of Rail (TOR) to the top of the sub-ballast. • Test track works • Special trackwork (e.g., turnouts, crossovers) • Track-related ROW equipment, crossings, and appurtenances • Ducting, cable containment, and associated infrastructure • Boundary limit south of the MSF turnaround (see Scope B figure below) • Design and implementation of all Temporary Works. • Field review, monitoring, and reporting for Temporary Works. • Support of excavation. • Laydown areas and traffic management. • Construction noise and vibration mitigation. • Environmental mitigation protection measures. • Provide all: o Labour, supervision, and management o Materials, plant and equipment o Survey, quality control, and environmental control o Documentation and testing support o Interface coordination Scope B MSF Track MSF trackwork supply and installation including: o Direct Fixation (DF) Track: from the Top of Rail (TOR) to the bottom of the plinths (second-pour concrete). o Ballasted Track: from the Top of Rail (TOR) to the top of the sub-ballast. • MSF trackwork (yard and shop) supply and installation • Test track works • Special trackwork (e.g., turnouts, crossovers) • Track-related ROW equipment, crossings, and appurtenances • Ducting, cable containment, and associated infrastructure • Boundary limit north of the MSF turnaround (see Scope B figure above) • Design and implementation of all Temporary Works. • Field review, monitoring, and reporting for Temporary Works. • Support of excavation. • Laydown areas and traffic management. • Construction noise and vibration mitigation. • Environmental mitigation protection measures. • Provide all: o Labour, supervision, and management Materials, plant and equipment o Survey, quality control, and environmental control o Documentation and testing support o Interface coordination Scope C Combined Track Package (Scopes A and B) • Main Line trackwork supply and installation including: o Direct Fixation (DF) Track: from the Top of Rail (TOR) to the bottom of the plinths (second-pour concrete). o Ballasted Track: from the Top of Rail (TOR) to the top of the sub-ballast. • MSF trackwork supply and installation including: o Direct Fixation (DF) Track: from the Top of Rail (TOR) to the bottom of the plinths (second-pour concrete). o Ballasted Track: from the Top of Rail (TOR) to the top of the sub-ballast. • MSF trackwork (yard and shop) supply and installation • Test track works • Special trackwork (e.g., turnouts, crossovers) • Track-related ROW equipment, crossings, and appurtenances • Ducting, cable containment, and associated infrastructure • Design and implementation of all Temporary Works. • Field review, monitoring, and reporting for Temporary Works. • Support of excavation. • Laydown areas and traffic management. • Construction noise and vibration mitigation. • Environmental mitigation protection measures. • Provide all: o Labour, supervision, and management o Materials, plant and equipment o Survey, quality control, and environmental control o Documentation and testing support o Interface coordination The following provisions and items are applicable to all respective trackwork scopes, comprising but not limited to the following: General Provisions • Deliver a complete, coordinated, safe, maintainable, and commissionable LRT track system for the respective trackwork scope. • The scope split matrix provided in Schedule 9 Construction Contract Form, with the Proponent taking primary responsibility for trackwork. • Applies across design, procurement, construction, testing, commissioning, handover, and warranty. Track equipment, including the supply, fabrication, delivery, installation, adjustment, inspection, and acceptance of: • Running rail • Jordan rail • Ties • Ballast • Direct fixation assemblies • Embedded track components • All required fittings and fixations • Guard rails • Restraining rails • Insulated joints • Expansion joints • Rail anchors • Rail lubricators • End-of-track protection devices • Special trackwork • Switch clearance devices • Switch heater equipment • Level crossings • Track drainage interfaces • Cable containment • Track troughs • Concrete plinths (second pour) System assurance for the scope of trackwork, including all applicable inspection, testing, and commissioning activities required for the respective trackwork scopes, including: • Factory Acceptance Testing (FAT) • Factory Integration Testing (FIT) • Pre-Installation Check-Out (PICO) • Site Acceptance Testing (SAT) Integrated interface testing • Trial running support • Closeout evidence • Acceptance testing • Any other activities applicable to the specific scope of work. Interfaces with other Construction packages • Stations, bridges, MSF building • Public roads and pedestrian crossings • Utility zones and embedded track areas • Transition slabs and systems equipment locations • Temporary tie-ins for staged construction • Communications & Traction Power Systems (wayside) • Signaling & Train Control Systems

Procurement

Procurement type
RFP
Procurement method
Competitive
Category
Construction
Jurisdiction
Alberta

Not stated in the notice: selection criteria, region of delivery, region of opportunity, expected contract period, end user

Requirements and qualifications

Supply arrangement
Not stated in the public notice
Security requirement
Not stated in the public notice
Trade agreements
—
Limited tendering reason
—

Classification

GSIN
—
UNSPSC
72141605

Amendments

No amendments observed.

Documents

No attachments listed in the open data.

Contact

No contact listed in the open data.

Related

More from this buyer

  • 24-2042-S10_Linear replacement and Extension and Corrosion ProtectionNov 12
  • Valve Chamber 2620 Nose Hill Drive and Scenic Acres Gate NW Butterfly Valve and Bypass Piping ReplacementNov 12
  • 26-081 – Maintenance, Support and Lifecycling of the Calgary Municipal Radio Network (CMRN) InfrastructureNov 16
  • RFSO 26-2004 - Cyber Security Reseller Services Nov 17
  • RFP 26-1738 West Confederation Park Wetland RestorationNov 17

Linked contracts

No related records observed.

Source

Open official source

Verify the notice and download the full solicitation on the official page.

Source
APC
Solicitation
26-1648
Reference number
AB-2026-05321
Observed
Nov 11, 2026

Never miss an amendment

Track this opportunity in your pipeline and watchlists with a free account.

Create free account