Create free accountThe work under this contract includes approximately 100m of shoreline restoration including, but not limited to: 1. Excavation and removal and disposal of native soil to specified limits; 2. Clearing and grubbing of existing trees in the work area; 3. Relocation of existing trees; 4. Introduction of a new swale; 5. Addition of a new rock berm; 6. .Removal of wharf timber superstructures; 7. Transportation of Riprap 1km from existing stockpile location to project site. Riprap stone to be provided by DFO; 8. Placement of new rip rap to lines and grades as indicated on the project drawings.
Not stated in the notice: end user
The source reports 6 amendments. CanPursue observed 5 of them with dates.