CanPursue

Research

  • Search
  • Opportunities
  • Buyers
  • Suppliers
  • Contracts
  • Awards

Intelligence

  • OverviewAccount required
  • WatchlistsAccount required
  • PipelineAccount required
  • IntelligenceAccount required
Create free account

Sign in

⌘K
ENFR
Foundation & Tower Replacement | Fisheries and Oceans Canada · CanPursue
Opportunities
Fit is part of the trial and paid plans.Closed

Foundation & Tower Replacement

Fisheries and Oceans CanadaFP802-180098Federal
Find on CanadaBuysAdd to pipeline
Published
Aug 16, 2018
Respond by
Aug 31, 2018
Latest amendment
None

See how this opportunity fits your company

Create a free account and describe your company. With the trial, CanPursue checks every opportunity against it and explains the fit.

Create free account

Who won similar work

Create a free account to see past contracts like this one: who won and at what price.

Create free account

Description

SCOPE OF WORK: .1  .1Mobilize to site with a work barge of appropriate size and certification; .2Clearing of rubble to expose bedrock. .1CCG staff will be on site to determine appropriate location for new tower. .3Install one [1] new concrete pier; .1Bidder shall assume water depth of 0.915 m for bidding purposes. .4Scheduling of concrete testing by CCG acquired third party firm. .5Transportation and installation of one [1] new CCG supplied aid to navigation (AtoN) tower; .6Salvage and return of the existing tower, complete with all appurtenances to CCG Base Parry Sound; .7Demolish and dispose of existing piers; and .8Demobilize. .2  .1Supply one [1] ATON tower; .1Tower is to be transported to site from staging location by contractor. .2Supply and installation of lantern, battery and solar panel onto new ATON tower. .3  .1Mandatory Technical Criteria: .1Each vessel used by the bidder for this contract must be registered in Canada in the Small Vessel Register (SVR) or the Canadian Register of Vessels (CRV) .2Deadline: .1With bid. .3Deliverables: .1Copy of registration certificate; and .2Picture of the vessel with its Official Number visible .4  .1Dewatering Plan (if relevant): .1Deadline: .1With Construction Plan .2Deliverables: .1Cofferdam and/or other relevant drawings Drawings must detail: Plan, elevation and relevant section views of the proposed installation; Any pertinent commentary concerning construction and implementation of dewatering plan.

.2Summary Report (if necessary): The summary report shall contain all additional technical references and requirements not otherwise detailed within the engineered drawings. .2Foundation Construction Plan: .1Deadline: .1With Construction Plan .2Deliverables: .1Provide high level summary of mix properties and admixtures to demonstrate compliance with CCG criteria and STEM foundation design; .2Provide MSDS, (pre-mixed products only). .3Concrete placement methods and curing procedures, detail:

Source of concrete, including mix plan; Shop drawings for formwork and false-work; Placement methods and procedures to control consolidation/segregation;If dewatering will not occur, tremie concrete pour details must be provided to CCG.

Location of necessary cold joints; Finishing procedures; Mill test certificates for rebar, piles or any other steel used in the foundations; Curing methods and schedule; Strength requirements for structural stability (removal of forms); Clean-up procedures; Mitigation measures to account for hot or cold temperatures where reasonably anticipated during the construction period.

.3As-built and Quality Control .1Deadline: .128 days following completion of construction activities .2Deliverables: .1Red-lined drawings showing all changes from the sealed design drawings (if any); Drawing or sketch indicating the position of the constructed pier relative to the former installation, detail: Height of former pier, bedrock to top of foundation; Difference in elevation from top of former pier to top of new pier; Highest high water mark of indicated former pier, relative to bedrock grade; Height of new pier, bedrock to top of foundation; Water level above bedrock for new pier; Horizontal offsets to the center of new pier (north, south, east, & west) relative to former pier.

.2Concrete test results. Part 2055000 METAL WORK .1Submittals .1Submittals shall be forwarded to Coast Guard in accordance with the provisions of section 013530. .2Drilling Plan: .1Deadline: .1 With Construction Plan. .2Deliverables:

Description of the equipment that will be utilized to drill into bedrock; Description of the methods that will be implemented to stabilize the drilling equipment, and to ensure verticality of holes; Description of how epoxying activities will occur; Provide material specifications for the epoxy adhesive to be used; Provide cut-sheets for the reinforcing bars to be used; Describe how works will be undertaken to mitigate impacts on the surrounding watercourse.

.3As Built Drawings: .1Deadline: 28 Calendar days following the acceptance of the works. .2Mandatory Technical Criteria .1Each vessel used by the bidder for this contract must be registered in Canada in the Small Vessel Register (SVR) or the Canadian Register of Vessels (CRV). Proof of registration as well as a picture of the vessel with its Official Number visible shall be submitted with bid. .2The operator of any vessel used by the bidder for this contract that is less than or equal to 5 Gross Tons must have a valid Small Vessel Operator Proficiency (SVOP) certificate. Proof of valid certificate must be submitted with bid. .3The operator of any vessel used by the bidder for this contract that is more than 5 Gross Tons or is a tug must have a valid Limited Master <60 GT certificate. Proof of valid certificate must be submitted with bid. FAMILIARIZATION WITH SITE Before submitting a bid, it is recommended that bidders visit the site and its surroundings to review and verify the form, nature and extent of the work, materials needed for the completion of the work, the means of access to the site, severity, exposure and uncertainty of weather, any accommodations they may require, and in general shall obtain all necessary information as to risks, contingencies and other circumstances which may influence or affect their bid or costs to do the work. No allowance shall be made subsequently in this connection on account of error or negligence to properly observe and determine the conditions that will apply. Contractors, bidders or those they invite to site are to review specification Section 01 35 30 - Health and Safety Requirements before visiting site. Take all appropriate safety measures for any visit to site, either before or after acceptance of bid. Bidders that wish to visit the site must send an email to Beverly.shawana@dfo-mpo.gc.ca and provide the following information: a. Business name b. Business address c. Business phone number d. Bidder’s representative name e. Bidder’s representative email address

Procurement

Category
Construction
Jurisdiction
Federal

Not stated in the notice: procurement type, procurement method, selection criteria, region of delivery, region of opportunity, expected contract period, end user

Requirements and qualifications

Supply arrangement
Not stated in the public notice
Security requirement
Not stated in the public notice
Trade agreements
—
Limited tendering reason
—

Classification

GSIN
—
UNSPSC
—

Amendments

No amendments observed.

Documents

No attachments listed in the open data.

Contact

No contact listed in the open data.

Related

More from this buyer

  • Request for Supply Arrangement for Charter VesselsDec 31

Linked contracts

No related records observed.

Source

Find on CanadaBuys

CanPursue has no direct link to this notice. This opens a CanadaBuys search for its solicitation number.

Source
CanadaBuys
Solicitation
FP802-180098
Observed
Sep 18, 2026

The amount, value range and contract duration shown on some CanadaBuys pages are not in the open data, so CanPursue does not show them.

Never miss an amendment

Track this opportunity in your pipeline and watchlists with a free account.

Create free account